Similar Projects
Repair Services for Existing Parking Control Equipment
Term Contract
Sub-Bidding
Hartford, CT 06103

Fluoroscopy Renovation
Renovation
Sub-Bidding
$500,000 CJ est. value
Farmington, CT 06030

Hired Equipment Snow and Ice Control 2021-2022
Term Contract, Alteration
Post-Bid
Greenwich, CT

Parking Meter Kiosk For Downtown Bridgeport
Alteration
Post-Bid
Bridgeport, CT

Walk Thru Metal Detectors (WTMD)
Results

Walk Thru Metal Detectors (WTMD)
Results

Rental Of Portable Toilets
Alteration
Post-Bid
West Haven, CT

Replacement of Roland Hall Steam Dryers
Demolition, Term Contract, Alteration
Results
New London, CT 06320

Acquisition of QUINT Fire Apparatus
Alteration
Post-Bid
Mansfield, CT

Walk-in Refrigerator/Freezer
Renovation
Results
$47,491 CJ est. value
Bridgeport, CT 06606

Cummins Generators For Pump Stations
Alteration
Post-Bid
Milford, CT

Roof Replacement at Terry Conners Ice Rink
Renovation
Results
$2,204,800 CJ est. value
Stamford, CT 06902

Buckley Elementary School Renovation Phase 2 - Furniture, Fixtures & Equipment
Alteration
Post-Bid
Manchester, CT 06042

AHU Filters
Renovation
Results
$30,687 CJ est. value
Waterbury, CT 06710

Kubota Tractor
Alteration
Post-Bid
Waterbury, CT

Last Updated 07/07/2023 11:18 AM
Project Title

Solar and Battery Storage at New London High School

Physical Address View project details and contacts
City, State (County) New London, CT 06320   (New London County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City has secured a ZREC tariff for up to 249 kW-AC of photovoltaic solar under Year 10 of the state's ZREC Program. In addition to the rooftop solar photovoltaic system, the City also seeks a bid alternate that includes a battery energy storage system (BESS) that will participate in the Energy Storage Solutions Program, administered by the Connecticut Green Bank (CTGB) and Eversource. Question Deadline 07/21/2023 at 4:00 PM ET End of Question Period: Bidders may submit written questions to the RFP Administrators at projects@solar-rfp.com and Joshua Montague at jmontague@newlondonct.org no later than 4:00 pm. Bid bonds, performance bonds, and labor and material bonds will be required as specified below. Guaranty or surety may be in the form of certified check. Bid Bond Ten percent (10%) due at time of bid for all contract services and public works/construction projects that exceed twenty thousand dollars ($20,000.00) Performance Bond One hundred percent (100%) of contract price for projects that exceed fifty thousand dollars ($50,000.00). Labor and Material Payment Bonds One hundred percent (100%) of contract price for projects that exceed fifty thousand dollars ($50,000.00)

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents