Last Updated | 04/03/2023 12:19 PM |
Project Title | Building Shell - Eastwood Shops / Niles |
Physical Address | View project details and contacts |
City, State (County) | Niles, OH 44446 (Trumbull County) |
Category(s) | Commercial, Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Retail, Site Development |
Contracting Method | Bids by Invitation |
Project Status | All Submissions Received, Selection Underway, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $3,200,000 [brand] Estimate |
Plans Available from | Selected Bidders |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | *As of April 3, 2023, a general contractor has been awarded, however their contact details have not been disclosed. This project primarily consists of exterior framing, sheathing and finishing to create a 12,000 SF shell building for future tenants. We will receive a pad ready site with completed foundations and erected structural steel. From there follow notes on A-103 for stone and slab placement correlating back to the structurals for specifications and details. Concrete placement encompasses surrounding sidewalks, adjacent curbs and partial building slab placement. The rest of the slab will be prepped with stone and vapor barrier for future placement by other tenants. The following trades will be required to complete this project: Concrete - pad ready site completed foundations by others - we are responsible for surrounding sidewalks, curbs, partial building slab, stone and vapor barrier; Masonry - do not include any foundation work - INCLUDE: Belden Modular Brick, Continental Cast Stone (detail on A-602) and Old Castle Echelon Split Face Masonry per finish legend on A-700, architectural wall cuts and structural sheets, include sealer per water repellant specification section in division 7; Structural Steel - Brick/Window Lintels and the Ladder (sheet A-603); Patio Railing - typical railing details are on A-602, elevation on #4/A-400 and the lengths can be determined on A-101; Metal Stud Framing and Sheathing - Include ALL wood detailed on plans be it 2x or plywood materials, include drywall for interior demising wall and all in-wall insulation detailed in the plans, include install of door frames, include fire caulking per specification section 078446; Install doors and hardware x 4; Caulking; Water Repellant over Plywood Barricade - Sika Corporation, Inc.; Sikagard-535 with SikaMembran 540 tape for all seams; EIFS - 2.1 MANUFACTURERS A. Basis-of-Design Product: 1. Dryvit Systems, Inc., Outsulation Plus MD. B. Alternate Manufacturers: 1. Finestone; Degussa Wall Systems, Inc. 2. Parex, Inc.; a brand of ParexLahabra, Inc. 3. Senergy; Degussa Wall Systems, Inc. 4. Sto Corp. 5. TEC; an H. B. Fuller company. Roofing - 2.1 TPO MEMBRANE ROOFING A. Fabric-Reinforced Thermoplastic Polyolefin Sheet: ASTM D 6878, internally fabric or scrim reinforced, uniform, flexible fabric backed TPO sheet. 1. Manufacturers: Subject to compliance with requirements, provide products by one of the following available manufacturers: a. Carlisle SynTec Incorporated. b. Firestone Building Products Company. c. GAF Materials Corporation. d. GenFlex Roofing Systems. e. Johns Manville. f. Mule-Hide Products Co., Inc. g. Versico Incorporated. 2. Thickness: 60 mils (1.5 mm) nominal. 3. Exposed Face Color: Light Gray. Metal Wall Panels - MT-4 - follow specification section 074214 for acceptable manufacturers and design considerations; Alucobond Metal Canopy Covering - AL-2 roughly 620 SF of material to cap the "canopy" on the front right corner of the building; Doors, Frames and Hardware - 4 Openings per A-700 and Division 8 specifications; Glass and Glazing - Acceptable storefront framing by: 1. Commercial Architectural Products, Inc. 2. EFCO Corporation. 3. Kawneer North America. 4. Oldcastle Building Envelope. 5. Tubelite. 6. United States Aluminum. 7. YKK AP America Inc. Painting - P-2 on plywood barricade at future storefront openings, exterior door frame and slab, all other items are pre-finished, provide alternate for water repellant to be applied to masonry and plywood; Canopy Cover @ Patio / Cantilevered Canopy @ Drive Thru - 2.1 MANUFACTURERS A. Basis-of-Design Product: Subject to compliance with requirements, provide product indicated on drawings or comparable product by one of the following: 1. Design Team Sign Company, LLC 2. Cardinal Architectural Company, LLC 3. Mapes 4. AAA Aluminum Products, Ltd. 5. Herculite 6. Panel Built, Inc. Plumbing - Roof drains, Storm pipe from roof drain to 5' outside the building, Underslab water service line, backflow and meter for 1 tenant other spaces just stubbed into space, include grease interceptor outside of building tie into existing sanitary lateral and stub into building; HVAC - 4 new York RTU's - 21.75 Tons, no air distribution drops into space from roof, power and gas to make operational; Electrical - Include everything from the power company transformer to the building, no site lighting other than picking up circuits within the building pad area and tying into panel H and include any building mounted security/site lights *The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder. *As of November 9, 2022, addendum A has been issued. |
||||||||||||||||||||||||||||||||||||||||
Details | 1 Story Above Grade, 12,000 SF.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |