Similar Projects
Morrills Corner - State Route 302 and 100
Alteration
Conception
Portland, ME 04101

15 Harrison Road Senior Housing
New Construction
Conception
$15,000,000 est. value
Bridgton, ME 04009

The Residences at Crosstree
New Construction - 1,045,296 SF
Design
$10,000,000 CJ est. value
Scarborough, ME 04074

Stacy M. Symbol Apartments
New Construction
Design
Westbrook, ME

Douglass Commons
New Construction, Infrastructure - 338,700 SF
Post-Bid
$27,000,000 CJ est. value
Portland, ME 04102

Douglass Commons
New Construction, Infrastructure - 338,700 SF
Post-Bid
$27,000,000 CJ est. value
Portland, ME 04102

Interstate 295 Southbound Over State Route 703 and Interstate 295 Southbound Over Westbrook Street Bridge Joints
Results
Less than $1,677,000 est. value
South Portland, ME 04106

Westbrook Street Shared Use Path – Phase II
Results
South Portland, ME 04106

Shipyard Brewery Redevelopment
New Construction, Demolition - 114,000 SF
Construction
$10,000,000 CJ est. value
Portland, ME 04101

Shipyard Brewery Redevelopment
New Construction, Demolition - 114,000 SF
Construction
$10,000,000 CJ est. value
Portland, ME 04101

Summit Community Church
New Construction, Infrastructure - 28,000 SF
Pending Verification
$8,000,000 CJ est. value
Gorham, ME 04038

Cummings Road Cannabis Cultivation Facility
New Construction, Infrastructure - 23,940 SF
Pending Verification
$2,500,000 CJ est. value
South Portland, ME 04106

MPI DOT Paving Stevens Avenue - City of Portland
Infrastructure
Conception
$450,000 CJ est. value
Portland, ME 04103

Winchester Woods
New Construction - 191,744 SF
Design
$14,380,800 est. value
Portland, ME 04103

Bond - School Construction Projects - Cape Elizabeth School Department
New Construction, Infrastructure
Post-Bid
$115,900,000 CJ est. value
Cape Elizabeth, ME 04107

Last Updated 03/29/2023 11:24 AM
Project Title

Herald Square Mixed-Use - Phase 1

Physical Address View project details and contacts
City, State (County) Portland, ME 04101   (Cumberland County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Hotel/Motel, Parking Garage, Paving/Reconstruction, Retail, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $300,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 29, 2023, the Major Site Plan Development has been approved . An architect and a construction manager have been selected. A firm construction timeline has not been set, however, construction is not expected to begin prior to second quarter 2023.

Details

,, 365,575 SF - 198,230 SF. 11 Stories Above Grade, 167,345 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Office Furniture, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents