Similar Projects
Derek Apartments Phase 1
New Construction, Infrastructure - 400,000 SF
Design
$10,000,000 CJ est. value
Spokane Valley, WA 99206

Monroe Grind and Overlay
Infrastructure
Bidding
$130,000 to $1,700,000 est. value
Spokane, WA 99204

Monroe Grind and Overlay
Infrastructure
Bidding
$130,000 to $1,700,000 est. value
Spokane, WA 99204

Hatch Road Bridge Deck Replacement
Infrastructure
Post-Bid
$1,800,000 to $2,200,000 est. value
Spokane, WA

Bigelow Gulch Road Project Six
Alteration
Post-Bid
Spokane, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Lummi Nation Seapond Dike Repair and Armoring
Infrastructure
Post-Bid
Bellingham, WA

Pedestrian Ramp Replacement
Infrastructure
Results
Deer Park, WA

Downtown Stadium
Alteration
Post-Bid
Spokane, WA 99207

Thorndyke Road MP 4.71 Culvert Replacement
Infrastructure
Results
$1,656,400 est. value

Evergreen Road Preservation
Infrastructure
Post-Bid
Spokane Valley, WA

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Spokane Airport Board Unit Price Airside Pavement Rehabilitation
Term Contract
Post-Bid
Spokane, WA 99224

2022 Eastern Region Chip Seal - South
Infrastructure
Results
$7,000,000 to $10,000,000 est. value

Last Updated 07/20/2022 12:40 AM
Project Title

44th Avenue -Crestline Street to Altamont Street

Physical Address View project details and contacts
City, State (County) Spokane, WA   (Spokane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction of approximately 1150 cubic yards of roadway excavation, 220 cubic yards of rock excavation, 7 each tree removals, 110 linear feet of storm sewer, 100 linear feet of absorption trench, 12 each drainage structures, 100 square yards of construct bio-infiltration swale, 3730 square yards preparation of untreated roadway, 1050 linear feet of cement concrete curb, 430 square yards of cement concrete sidewalk, 3500 square yards of 4-inch thick asphalt pavement, 440 square yards of hydroseeding, 980 square feet of pavement marking, sundry utility adjustments, and other related miscellaneous items.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents