Similar Projects
ADA Improvement Includes Sidewalk Removal, Combination Concrete Curb and Gutter Removal and Replacement and Installation of Concrete Sidewalk
Infrastructure
Bidding
Chicago, Joliet, IL

2022 Rebuild Illinois Bond Funds Program Contract #1
Infrastructure
Bidding
$260,000 est. value
Crest Hill, IL

Fifth Street to Ninth Street Roadway and Water Main Improvements
Post-Bid
Lockport, IL

Roadway Reconstruction, Water Main Installation, Storm Sewer Installation, Sidewalk Reconstruction
Post-Bid
Lockport, IL

(2.87-Mile) Crack and Joint Sealing Improvements on US 30 from Larkin Ave
Results
Crest Hill, Joliet, IL 60435

Crack and Joint Sealing of PCC Pavement
Results
Naperville, Plainfield, IL 60544

Plainfield Township General Maintenance Project
Infrastructure
Bidding
$290,000 est. value
Plainfield, IL

Dellwood Park Oslad Development 2021
Post-Bid
Lockport, IL

Patching
Results
Joliet, IL 60433

Street Resurfacing and HMA Patching Program
Infrastructure
Bidding
$200,000 est. value
Bolingbrook, IL

Heritage Bluffs Golf Club Cart Path
Post-Bid
Channahon, IL 60410

(1.988-Mile) Smart Overlay on Governor Hwy
Results
University Park, IL

Crackfilling HMA Pavement
Infrastructure
Bidding
$200,000 est. value
Bolingbrook, IL

Oakwood Cemetery Lane Improvements
Post-Bid
Joliet, IL

County-Wide ADA Improvements of Curb Ramps for Sidewalks
Results
Lockport, IL 60441

Reported 04/21/2022 12:00 AM
Project Title

Resurfacing or Rehabilitation Paving Work

Physical Address View project details and contacts
City, State (County) Bolingbrook, IL 60440   (Will County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Resurfacing or rehabilitation paving work, including hot-mix asphalt surface removal, curb and gutter removal and replacement; PCC driveway and sidewalk replacement, curb line storm sewer structure replacement; frame and grate adjustments; hot-mix asphalt leveling binder, surface course paving; pavement markings; parkway restoration; and all appurtenant construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents