Similar Projects
Reconstruction of Narcille Street and Colby Drive
Infrastructure
Bidding
Baytown, TX 77520

Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Bridgeland Creekland Village Section 3
Infrastructure
Bidding
TX

Asphalt Pavement Parking Lots
Post-Bid
Houston, TX 77000

Asphalt Products and Services, Installation and Related Materials
Post-Bid
Houston, TX 77000

Southern Region Disaster Recovery Support BPA
Results

Replacement of the Thin-Bonded Permeable Friction Course (TBPFC) Overlay Replacement and Sam Central Toll Plaza Fault Repair
Results
Less than $4,900,000 est. value
Houston, TX 77040

Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Bridgeland Creekland Village Section 4
Infrastructure
Bidding
TX

Wafer Street Paving and Drainage Improvements Phase II Project
Post-Bid
Pasadena, TX

Planing, Underseal, Overlay and Pavement Markings
Results
Less than $12,023,523 est. value
TX

Dense-Graded Hot-Mix Asphalt and Related Items, Precinct 3
Infrastructure
Bidding
Houston, TX

Waugh Drive, Commonwealth Street and Montrose Blvd @ Westheimer Intersection Improvements
Post-Bid
$3,000,000 est. value
Houston, TX 77006

Realignment of Tierwester Street From 7034 Tierwester Street to Idaho Street
Results
Less than $975,757 est. value
Houston, TX

VA - Hazard Elimination and Safety
Infrastructure
Bidding
$1,509,546 est. value
TX

Keith Street Widening
Post-Bid
Houston, TX 77093

Leeland Bike Lane Construction
Results
Less than $1,555,199 est. value
Houston, TX 77002

Last Updated 07/29/2021 12:20 PM
Project Title

Beinhorn Road Reconstruction

Physical Address View project details and contacts
City, State (County) Hunters Creek Village, TX 77024   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project work limit is Beinhorn Road, Hedwig Road to Kuhlman Road. The work primarily consists of the in-place pulverization of the existing roadway material. After pulverization, a stabilization agent will be mixed into the existing roadway material and the material will be compacted, graded and shaped. A two-inch thick asphalt surface will be placed on the stabilized base material. Ancillary work includes traffic control, and replacement of existing pavement markings.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents