Similar Projects
Gettys Center Windows Reglazing and Abatement
Bidding
Rock Hill, SC 29730

Lexington Community Mental Health Center Window Replacement South Side and West End
Bidding
$50,000 to $90,000 est. value
Lexington, SC 29072

Overhead Door Maintenance IDIQ
Post-Bid
Columbia, SC 29207

Door Modification
Post-Bid
Less than $20,000 est. value
Gaffney, SC

Replacement of Windows and Modification of Security Window Screens in 35 Occupied Dwelling Units
Results
Abbeville, SC

Replace Visitor Center Bi Fold Doors
Results
Gaffney, SC

Window Balance Replacment
Bidding
Clover, SC 29710

Forceable Entry Doors for Fire Science Class
Post-Bid
Clover, SC 29710

Energy Savings Performance Services
Term Contract
Results
Columbia, Eastover, Hopkins, SC 29209

Six Mile Elementary School Door and Door Hardware Replacement
Bidding
Easley, SC 29640

Classroom Doors and Door Hardware Replacement
Post-Bid
Effingham, Florence, SC 29501

54--Installation of Sliding Doors
Results
Columbia, SC 29209

5670--Manual Roll Down Storm Protection ( Provide and Install)
Bidding
Columbia, SC 29209

Window Glass Repair and Replacement at Greenville High Academy
Post-Bid
Greenville, SC 29601

Detention Facility Lock Upgrade
Results
Spartanburg, SC 29303

Last Updated 12/22/2020 12:27 AM
Project Title

Purchase and Installation of New Doors at Human Services Building

Physical Address View project details and contacts
City, State (County) Summerville, SC 29477   (Berkeley County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall furnish all labor, tools, materials, equipment, and supervision necessary to purchase and install new doors in the specified wings of the HSB at 500 North Main Street, Summerville, SC. 1. Provision of new doors as specified by Dorchester County in Attachment 1 – Door Specifications and Layout. 2. On the first floor wing, installation of new doors in existing door frames using the existing hardware. 3. Installation of new door frames (where needed) and new doors with new hardware on the second floor of the HSB. This shall take place after the first floor is completed. Measurements of doors for second floor will need to be conducted during site visit. Determination of frame replacement or installation shall need to take place during site visit. All second floor doors will need new hardware. 4. Painting/staining of DOOR FRAMES shall not be the responsibility of the contractor. 5. Contractor must obtain permitting and business license from the Town of Summerville. 6. Contractor must ensure finished work meets county’s approval. 7. Contractor must remove all debris left over. 8. Any change orders not in the scope or agreed upon prior to work beginning must be approved before it is started. 9. All work must meet all electrical and building code standards.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents