Similar Projects
San Souci Road Elevation Design
Infrastructure
Design
WA

CRT5 Repair Construction
Alteration
Design
$1,000,000 est. value
WA

Foothills Trail - Phase II Segment B
Infrastructure
Bidding
$13,643,700 est. value
Issaquah, WA

SR18 Et AL, Northwest Region HMA Crack Seal and Pavement Repair
Infrastructure
Bidding
$2,000,000 to $2,500,000 est. value
Covington, WA 98042

Curb Management Plan
Infrastructure
Post-Bid
$150,000 to $225,000 est. value
Bellevue, WA 98007

Transit Facility Improvements Work Order
Infrastructure
Post-Bid
WA

Construction of the 34th Avenue S, South 166th Street to South 160th Street
Infrastructure
Results
$6,250,000 to $7,250,000 est. value
Sea-Tac, SeaTac, WA 98188

2021 Sidewalk And ADA Improvements
Infrastructure
Results
$200,000 to $300,000 est. value
Auburn, WA 98092

14th Avenue Residential Development
New Construction, Demolition, Alteration
Pending Verification
$1,000,000 est. value
Seattle, WA 98117

Alexandria Center for Science and Technology / Bellevue
New Construction, Infrastructure - 716,000 SF
Design
$250,000,000 est. value
Bellevue, WA 98005

Lift Station 18 Upgrade - Phase I Forcemain Improvements
Infrastructure
Bidding
$715,000 est. value
Normandy Park, WA 98166

Task Order Unit Price - Curb Ramps and Sidewalks Contract 2
Term Contract, Infrastructure
Post-Bid
Less than $4,000,000 est. value
Seattle, WA

SR 516 - Jenkins Creek to 185th Pl SE
Infrastructure
Results
Covington, WA 98042

I-405/SR 522 to SR 527 - Widening and Express Toll Lane
Infrastructure
Design
$510,000,000 est. value
Bothell, WA 98011

Sunset Highway and 77th Avenue Southeast Intersection Improvements
Infrastructure
Bidding
$985,000 est. value
Mercer Island, WA 98040

Last Updated 06/27/2022 07:32 AM
Project Title

SouthEast May Creek Park Drive Non-Motorized Improvements

Physical Address View project details and contacts
City, State (County) Newcastle, WA 98059   (King County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,667,851
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a mixed-use development in Newcastle, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project. The work provides for the construction of 3,900 feet of pedestrian and bicycle improvements on the north side of SE May Creek Park Drive from SE 86th Place to 121st Avenue SE. Work includes, but is not limited to, excavation, grading, subgrade preparation, furnishing and installing gravel surfacing, hot mix asphalt, storm drainage improvements, cement concrete curbs, gutters, and sidewalks, retaining walls, permanent signing and pavement marking; miscellaneous surface restoration; traffic control; and other work indicated in the Contract Provisions.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents