Similar Projects
Granular Activated Carbon Filtration System Installation and Maintenance
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value

Galvanized Pipe Replacement (RGH)
Post-Bid
Laurel, MD 20707

Patuxent Raw Water Pipeline Phase I and Phase II
Results
Less than $10,488,180 est. value
Laurel, MD 20707

Largo Road Transmission Water Main Replacement
Results
Laurel, MD 20707

Water Line Installation Fraternity Row
Infrastructure
Post-Bid
$100,000 to $500,000 est. value
College Park, MD 20740

Cherry Hill Water Main Replacement
Results
Laurel, MD 20707

Domestic Water Valve Vault
Infrastructure
Post-Bid
College Park, MD 20742

Task Order 66 Randolph Street Water Main Replacement
Results
Bladensburg, MD

Water Systems Preventive Maintenance, and Service Repairs.
Term Contract
Post-Bid
Beltsville, MD 20705

Design/Build Contract with Guaranteed Maximum PriceUnderground Utilities Project at University of Maryland College Park
Term Contract
Results
Less than $6,800,000 est. value
College Park, MD 20742

Fraternity Row Water Main Connections
Infrastructure
Post-Bid
$300,000 est. value
College Park, MD 20742

Fairway View Lane Water Main Replacement
Results

Wheeler Road Water Main Replacement
Infrastructure
Results
$2,318,354 est. value
Hillcrest Heights, Marlow Heights, MD

24-Inch Transmission Water Main
Infrastructure
Results
Laurel, MD

Solid Wedge Gate Valve
Infrastructure
Results
Laurel, MD

Last Updated 06/21/2022 10:09 AM
Project Title

Watkins Regional Park-Water/Sewer - 4.99.0179 - Prince Georges County

Physical Address View project details and contacts
City, State (County) Kettering, MD 20774   (Prince Georges County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2023
Bids Due View project details and contacts
Estimated Value $3,267,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A master plan was completed for the park in 2019.. The first phase of the plan includes an engineering assessment of the water and sewer infrastructure. The project is included in the county's 2023-2028 Capital Improvement Program (CIP). As of June 17, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents