Similar Projects
Commercial Parking Lot Modification
New Construction, Alteration - 3,000 SF
Design
Newport, RI

Atlantic Avenue Bike Path
Infrastructure
Bidding
$2,000,000 est. value
Westerly, RI 02891

Providence Station State of Good Repairs and Capacity Project-Ped Improvements
Infrastructure, Alteration
Bidding
$2,000,000 est. value
Smithfield, RI

Parcel 25 Temporary Parking Lot Restoration
Post-Bid
Providence, RI 02903

Construction Services for City Wide 50/50 Sidewalk Program
Post-Bid
Pawtucket, RI

Sylvian Street Infrastructure and Streetscape Improvements
Results
Central Falls, RI

Infrastructure and Streetscape Improvements to Improve Residents' Access to Commuter Rail Station and Bus Hub
Results
Central Falls, RI

Blackstone River Bikeway
Post-Bid
Central Falls, RI 02863

School Street Reconstruction
Results
Westerly, RI

Integrally Colored and Stamepd Concrete Sidewalk/Steps/Patio
Post-Bid
Providence, RI

HSIP Intersection Safety Improvements Route 37 and Natick Avenue
Results
Providence, RI 02908

Tunnel Pump Station Lot Crack Repairs
Post-Bid
Providence, RI 02905

Granite Curbing
Term Contract
Results
Woonsocket, RI

Site Improvements at Multiple Locations
Infrastructure
Post-Bid
Warwick, RI 02889

Installation of Portland Concrete Cement Sidewalks
Term Contract
Results
Woonsocket, RI

Last Updated 04/15/2022 03:26 PM
Project Title

Replace Exterior Walkway

Physical Address View project details and contacts
City, State (County) Newport, RI   (Newport County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Building 116CC is a 20,000 sf single story, concrete building. An existing steel walkway passes over the south end of the building to connect Cunningham Street, on the west side (front) of Building 116CC, to Lay Street, on the east side of Building 116CC. This steel walkway has deteriorated to the point that it is no longer safe to use. The work includes but is not limited to the removal of the existing steel walkway, removal and provision of existing concrete landings and sidewalks, and provision of new fiber reinforced plastic (FRP) walkway. Adjacent concrete landings have also deteriorated and need replacement in order to accept new anchors.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents