Similar Projects
Public Safety Building - PUBSF 24-01 - City of Waukee
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Waukee, IA 50263

Monroe Court Water Main: 70th to 72nd - WA08-01 - City of Urbandale
Infrastructure
Conception
$344,500 CJ est. value
Urbandale, IA 50323

Cove at Kettlestone - Lots 2 & 3
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Waukee, IA 50263

Ashley Acres
New Construction, Infrastructure
Design
$70,000,000 CJ est. value
Waukee, IA 50263

3rd Street Elevated Storage Tank Replacement
Infrastructure
Bidding
$900,000 CJ est. value
Waukee, IA 50263

Ute Avenue Resurfacing
Infrastructure
Bidding
$318,000 CJ est. value
Waukee, IA 50263

Rapid Response Single Award Task Order Contract (SATOC)
New Construction
Post-Bid
Less than $95,000,000 est. value

RFP Design - Woodward Resource Center Utility Decentralization
Renovation
Post-Bid
$300,000 CJ est. value
Woodward, IA 50276

Waukee Public Works Building 2nd Floor Expansion
Addition - 3,045 SF
Results
Waukee, IA 50263

North West Meredith Drive Overlay
Infrastructure
Results
$645,407 est. value
Waukee, IA

Dupaco Community Credit Union / Waukee
New Construction, Infrastructure - 6,400 SF
Pending Verification
$1,500,000 CJ est. value
Waukee, IA 50263

Fourth Street Park Building - City Of Waukee
New Construction, Infrastructure - 2,373 SF
Pending Verification
$18,736,000 CJ est. value
Waukee, IA 50263

Monroe Court Water Main: 72nd to Roseland - WA18-01 - City of Urbandale
Infrastructure
Conception
$424,000 CJ est. value
Urbandale, IA 50323

James Pointe Plat 3 Lot 1 (Troy Plex)
New Construction, Infrastructure - 46,800 SF
Design
$5,000,000 CJ est. value
Waukee, IA 50263

RFQ Contractor - Dallas County Admin Building - BP-23.03 BAS
Demolition, New Construction, Infrastructure
Bidding
$700,000 CJ est. value
Adel, IA 50003

Last Updated 04/24/2023 03:11 PM
Project Title

RFQ Contractor - Dallas County Admin Building - BP-05.01 Structural Steel & Misc Metals

Physical Address View project details and contacts
City, State (County) Adel, IA 50003   (Dallas County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,800,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Any/all questions are to be submitted electronically.Questions can be submitted at any time but must be submitted. Responses to questions received will be published as a clarification document and posted to Building Connected by 5:00 PM on April 19, 2023. This packages includes supply and fabrication of all structural steel. This package also includes hoisting and install of all steel components. Miscellaneous Metals included in this package Turner Construction will receive Statements of Qualification (also referred to as Preapproval Forms herein) for construction of Dallas County Administration Building in Adel, Iowa. The project consists of site improvements, construction of a new 54,566 square foot two story building, and demolition of existing buildings. The Construction Manager and/or Owner will review, and score submitted Preapproval Forms based upon an objective scoring process and statutory criteria. Submissions meeting or exceeding minimum scoring criteria shall be deemed as an approved bidder for the project. The Construction Manager and/or Owner retain the right to reject any/all submission documents if documentation is deemed flawed, incomplete, or insufficient to properly score. All submitters must complete and submit the correct Prequalification Forms and supporting documentation to be considered responsive.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents