Similar Projects
CTH N Road Improvements
Infrastructure
Bidding
$1,700,000 est. value
Hilbert, WI 54129

Northeast Region-Wide Deck Sealing FY22, Various Backbone Routes STH
Infrastructure
Bidding

2021 Road Paving
Post-Bid
Chilton, WI

Asphalt a Boat Harbor Parking Lot
Infrastructure
Post-Bid
Brothertown, WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Chilton - Valders, STH 67 - Roosevelt Street
Results
Chilton, Valders, WI 53014

Paramount Drive Improvements
Infrastructure
Bidding
$150,000 est. value
Stockbridge, WI 53014

City Of Lax - Greenbay Sw And Curb Replacement
Infrastructure
Post-Bid

Asphaltic Concrete Pavement
Results
Chilton, WI

2022 Prospect Street Utility and Street Improvements, A SDWLP
Infrastructure
Bidding
$360,000 est. value
New Holstein, WI 53061

A-22 Concrete Paving
Infrastructure
Post-Bid
Appleton, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Harrison Ryford Street and Highland Court Culvert and Roadway Construction
Results
WI 54952

Saint Charles Road Improvements, Paradise Road to CTH G
Results
Less than $510,000 est. value
Brothertown, WI

Saint Charles Road, TRID Improvements
Results
Less than $400,000 est. value
Brothertown, WI

Last Updated 02/14/2022 03:24 AM
Project Title

Menasha - Hilbert, USH 10 - Village of Sherwood; Stockbridge - Kaukauna, South Jct. STH 114 - Castle Drive

Physical Address View project details and contacts
City, State (County) WI   (Calumet County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Grade, Storm Sewer, Base, Concrete Pavement, Asphalt Pavement, Curb and Gutter, Sidewalk, Signing, and Pavement Marking. Excavation Common, 30,742 CY; Base Aggregate Dense, 38,450 Ton; Base Aggregate Open Graded, 79 Ton; Concrete Pavement, 3,802 SY; Marking Epoxy, 20,792 LF; Construction Staking, 29,910 LF; Construction Staking, 160 Each; Construction Staking, 1 LS; Storm Sewer Pipe, 557 LF 4“, 1,059 LF 8“, 705 LF 12“, 1,385 LF 15“, 3,151 LF 18“, 1,528 LF 21”, 319 LF 24”, 52 LF 30”; Concrete Curb, 202 LF; Concrete Curb and Gutter, 11,280 LF; Concrete Sidewalk, 48,244 SF; Asphaltic Surface, 35 Ton; HMA Pavement, 5,658 Ton; Tack Coat, 1,551 Gals; Signs, 527 SF

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents