Similar Projects
Second Creek Farms
New Construction
Design
Commerce City, CO 80022

Grange Hall Creek Park Rehabilitation
New Construction
Bidding
Less than $2,800,000 est. value
Thornton, CO 80233

Water World Former Funhouse 2021
Post-Bid
Federal Heights, CO 80260

Playground Surfacing Engineered Wood Fiber
Post-Bid
Brighton, CO 80601

CO FLAP DEN 56(1) Access Connections to ROAR
Results
$3,000,000 to $4,000,000 est. value
Commerce City, CO

Pioneer Park In-Ground Concrete Skate Park Repairs
Results
$100,000 to $120,000 est. value
Commerce City, CO 80022

Playground Improvement
Post-Bid
Brighton, CO 80601

Veterans Memorial Park
Results
Less than $2,000,000 est. value
Commerce City, CO 80022

2020 GC - Water World Summit Springs
Post-Bid
CO

Parks Sports Court Resurfacing
Results
Brighton, CO 80601

Waterslide and Play Structure Maintenance Services - Outdoor Leisure Pool at Pioneer Park
Post-Bid
Commerce City, CO 80022

Dog Park Improvements
Results
Brighton, CO 80601

Frank Varra Park - US36 Bikeway Trail Realignment
Results
Westminster, CO 80021

Design Build Basketball Court and Trail
Results
Brighton, CO 80601

Columbia Park Irrigation and Playground Rehabilitation
Results
Thornton, CO 80229

Last Updated 01/22/2020 09:52 AM
Project Title

Tollgate Crossing Neighborhood Park Project

Physical Address View project details and contacts
City, State (County) Aurora, CO   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $887,000 to $937,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the new construction of Tollgate Crossing Neighborhood Park. The undeveloped site is located adjacent to the Murphy Creek Trail in the Tollgate Crossing Neighborhood. The site is south of E. Belleview Ave and east of E. Progress Drive. Proposed improvements include but are not limited to earthwork, erosion control, concrete paths with neighborhood and regional trail connections, concrete curb ramps and crusher fines trails. Also included are an accessible play area for children ages 2-5, an accessible fitness area for older children and adults, an embankment play and trail race area, tennis courts and a picnic shelter with site furnishings. Landscape improvements include a full irrigation system, seeded native grasses, limited sod tree lawns, evergreen trees, deciduous trees and various native shrubs and perennials. Select equipment and installation has been purchased outside of this contract as noted in the contract proposal.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents