Similar Projects
West Wall and Stem Wall
Alteration
Bidding
$180,000 est. value
Chandler, OK

OU Childrens Hospital Clinics Building North Stair Tower Tread Replacement
Alteration
Bidding
$100,000 est. value
Oklahoma City, OK 73104

Concrete Facade Repair NC-210
Alteration
Post-Bid
Norman, OK 73069

730 College Avenue Exterior Renovation
Alteration
Post-Bid
Norman, OK 73069

Removal and Replacement of Rock Wall and Canopy Install Project
Alteration
Results
$80,000 est. value
Muskogee, OK 74403

Arrivals Roadway Canopy Fabric Replacement
Alteration
Results
Tulsa, OK

Wind Tunnel Replace Exterior Metal Stairs
Alteration
Post-Bid
Norman, OK

Install Loading Dock
Term Contract
Results
$100,000 to $250,000 est. value
Enid, OK 73703

Outdoor Canopy for Community Health Connection Clinic
Alteration
Post-Bid
Tulsa, OK 74146

OSU Feed Mill Ladder Retrofit
Alteration
Results
Stillwater, OK 74075

Health Sciences Barson Building Exterior Renovations
Alteration
Post-Bid
Tulsa, OK 74107

Power Wash and Seal Building Exterior
Alteration
Post-Bid
Oklahoma City, OK 73104

Terrace Work, Pond Work and Waterway Repair | N/2 Sec 21-26N-22WIM
Infrastructure
Post-Bid
Oklahoma City, OK

Rehab and Paint Tainter Gates Tenkiller
Term Contract
Post-Bid

Wastewater Treatment Plant Handrail Replacement
Alteration
Post-Bid
Perry, OK

Reported 06/07/2022 12:00 AM
Project Title

Install of Safety Rail

Physical Address View project details and contacts
City, State (County) Mannsville, OK   (Johnston County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install approx 300 linear ft of safety rail made from 3x3 eleven gauge square tubing 24" above ground and 18" below ground using 3x3 eleven gauge square tubing as posts cemented every 10 ft. Any open ends must be capped. Metal does not need to be primed or painted.

Details

Division 05 - Metals, Metal Railings, Pipe and Tube Railings, Decorative Metal Railings, Glazed Decorative Metal Railings, Wire Rope Decorative Metal Railings.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents