Similar Projects
Replace Roof and Repair Concrete and Brick-Hearnes Complex Buildings-Fulton State Hospital
Alteration
Bidding
$5,000,000 est. value
Fulton, MO 65251

Rubber Roof System
Alteration
Bidding
$300,000 est. value
Poplar Bluff, MO 63901

New Metal Roof
Alteration
Post-Bid
Gerald, MO

Roof Replacement
Alteration
Post-Bid
$70,000 to $76,000 est. value
Saint Louis, MO 63108

Roof Replacement, Housing Unit 4
Results
Jefferson City, MO 65101

Turkey Creek and Shoal Creek Wastewater Treatment Facilities, Digester Roof Repairs
Results
$750,000 est. value
Joplin, MO 64801

New Chapel Hill Elementary School - Precast
Alteration
Construction
Gladstone, MO 64119

Replace Roof and Repair Trusses Beauvais-Amoureux House
Alteration
Bidding
$250,000 est. value
Coffman, MO 63670

Roof Replacement
Alteration
Post-Bid
Arnold, MO

Pet Adoption Center Roof Replacement
Results
Saint Peters, MO 63376

Roof Trusses
Alteration
Bidding
Saint Louis, MO

Roof Repairs and Installations
Alteration
Post-Bid
Saint Louis, MO 63143

Roof Replacement - Albany Readiness Center
Results
Albany, MO

Roofing Services 2022
Term Contract
Bidding
Saint Louis, MO 63110

Technology Room Roofing
Alteration
Post-Bid
Iberia, MO

Last Updated 05/10/2022 07:32 AM
Project Title

Partial Roof Replacement Project at Stapleton Elementary

Physical Address View project details and contacts
City, State (County) Joplin, MO 64804   (Newton County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project shall include the removal ofthe two existing roof layers down to the deck at Stapleton Elementary. Installation of2" tapered EPS. Install a Vz inch dens deck, mechanically fastened over EPS insulation. The new roof shall be 60 mil, fully adhered, white TPO manufactured by Carlisle Syntec, Versico, GAF or other comparable product approved by the district. Remove existing guttering and downspouts. Provide and install commercial type guttering and downspouts in coordination color to be approved by Joplin Schools prior to ordering. 20-year extended manufacturer warranty. Contractor is responsible for proper disposal ofremoved existing roof material, insulation and any other debris from the roof (contractor to provide dumpsters). Proposals are to be "Turn-Key" and shall include all materials, labor, and any other costs necessary for the new roof installation.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents