Similar Projects
Last Updated | 08/19/2021 12:01 PM |
Project Title | Crosby-Garfield Center Mechanical Upfit |
Physical Address | View project details and contacts |
City, State (County) | Raleigh, NC 27601 (Wake County) |
Category(s) | Single Trades |
Sub-Category(s) | Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope is as follows: 1. Remove the existing Andover control system and replace with a new DDC Control System. 2. Provide new reheat hot water coils in supply ductwork. Modify ductwork as required. 3. Replace 3-way hot water control valves on air handling units with 2-way hot water control valves. 4. Replace motor starter on secondary pump with new VFD. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |