Project Title | Brandy Branch and Kennedy Generating Station Combustion Turbine CO2 Fire Protection System Upgrades |
Physical Address | View project details and contacts |
City, State (County) | Jacksonville, FL 32234 (Duval County) |
Category(s) | Single Trades |
Sub-Category(s) | Fire Protection |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Upgrade the CO2 Fire Protection Systems on 4 generating units at 2 sites: Brandy Branch Generating Stations B51, B52, B53 and Kennedy Generating Station K37, on a turnkey basis as described in this Solicitation (the "Work") and to determine the best method for JEA to procure the Work with regards to pricing, quality, design, and workmanship. Contractor to upgrade the CO2 Fire Protection Systems on 4 generating units at 2 sites: Brandy Branch Generating Stations B51, B52, B53 and Kennedy Generating Station K37, on a turnkey basis. Upgrades should bring units into compliance of NFPA Life Safety Requirements. Affected compartments include the turbine compartment, gas compartment, and hydraulic/lube oil compartment on all units and the atomizing air compartment on units B51 and K37. This work includes: 1. Replacing the CO2 valves for each compartment to pneumatic time delayed valves 2. Adding pneumatic sirens, bypass valves, and appropriate signage on all CO2 protected compartments 3. Replacing/upgrading the alarm panel on each unit to support new and current valves for each compartment 4. Install any and all electrical and controls cabling to allow DCS communication to new panel 5. 1Install piping and fittings to incorporate the generator collector compartment on the low pressure tank system for all units (currently protected by high pressure cylinders) 6. Modify the CO2 tank headers to add additional zone for collector cab on units B51 and K37 7. Add double block and bleed valve configurations to match existing for the newly installed zone for generator collector cab on units B51 and K37 |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |