Similar Projects
West Ridge High School Team Room Building
New Construction, Infrastructure
Design
$770,000 CJ est. value
Blountville, TN 37617

SR-126 (Memorial Blvd.) From East Cooks Valley Rd. to I- 81 in Kingsport - Tennessee Department of Transportation (TDOT)
Infrastructure
Design
$50,100,000 est. value
Blountville, TN 37617

Resurfacing on U.S. 11W (S.R. 1)
Infrastructure
Bidding
$3,000,000 CJ est. value
Kingsport, TN 37660

Resurfacing on U.S. 11W (S.R. 1)
Infrastructure
Bidding
$3,000,000 CJ est. value
Kingsport, TN 37660

Cheatham Stoplog Concrete Storage Slab
Term Contract, Infrastructure, Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value

Exterior Site Improvements Rice Terrace, Johnson Court and Mosby Homes
Infrastructure, Renovation
Post-Bid
$711,000 CJ est. value
Bristol, TN 37620

Legion Drive Roundabout
Results
Kingsport, TN 37664

Resurfacing
Infrastructure
Results
TN

Fox Meadows - Phases 4, 5, 6
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Bristol, TN 37618

Taco Bell / Bristol
New Construction, Infrastructure - 2,551 SF
Pending Verification
$800,000 CJ est. value
Bristol, TN 37620

New Fire Station No. 2 - City of Kingsport
New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Kingsport, TN 37663

Sullivan County Schools Central Middle School Track Renovation
Infrastructure
Bidding
$70,000 CJ est. value
Blountville, TN 37617

Parking Lot Paving
Infrastructure
Post-Bid
$200,000 est. value
Bristol, TN

West Ridge High School Paving Project
Infrastructure
Results
Blountville, TN 37617

Pickleball Complex - City of Bristol
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Bristol, TN 37620

Last Updated 02/09/2023 09:41 AM
Project Title

Eastman / ACCOYA Wood Production Facility

Physical Address View project details and contacts
City, State (County) Kingsport, TN 37660   (Sullivan County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $136,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for an industrial wood production facility. Exact scope details have yet to be disclosed. As of February 7, 2023, the project is in planning. Information regarding the architect has not been disclosed. A General Contractor has been selected. A start date has not been announced but construction is expected to be complete in early 2024.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents