Similar Projects
Jasper Parkway South
Infrastructure
Design
$3,500,000 est. value
Prescott Valley, AZ 86314

Construction of the Micro and Slurry Sealing Program FY22-23
Term Contract
Bidding
Prescott Valley, AZ

Annual Asphalt Paving Program FY 22/23
Term Contract
Bidding
Prescott Valley, AZ

Supply or Supply and Deliver Hot Asphaltic Concrete
Post-Bid
Prescott, AZ

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

FY 21 Slurry Seal Project
Results
Less than $1,400,000 est. value
Chino Valley, AZ

Intersection Improvement
Results
Less than $1,200,000 est. value
Chino Valley, AZ

Micro and Slurry Sealing Program FY22-23
Term Contract
Bidding
Prescott Valley, AZ

Roadway and Parking Lot Crack Seal with Seal Coat Applications
Post-Bid
Prescott, AZ

Cottonwood Street Visibility Improvements and Willard Street Dip Repair Project
Results
Cottonwood, AZ 86326

SR 179 Turn Lane Improvements at Beaverhead Flat Road
Infrastructure
Bidding
$404,877 est. value
Cornville, AZ 86325

Regional FFP IDIQ MATOC Roads, Bridges, Construction and Maintenance Sources Sought
Term Contract
Post-Bid
$1,000,000 to $10,000,000 est. value
Flagstaff, Prescott, Rio Verde, AZ - Albuquerque, NM 86301

Viewpoint Drive/Pronghorn Ranch Parkway Intersection Improvement Project
Results
Prescott Valley, AZ

Pioneer Parkway Roundabout at Commerce Drive
Infrastructure
Bidding
$3,706,000 est. value
Prescott, AZ 86305

Rubberized Chip Seal Pavement Preservation
Infrastructure
Post-Bid
$3,132,345 est. value
Prescott, AZ

Last Updated 04/29/2022 08:12 AM
Project Title

FY 2022 Street Improvements Project

Physical Address View project details and contacts
City, State (County) Chino Valley, AZ   (Yavapai County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Construction work, in general, consists of furnishing all labor, materials, equipment, and services for the reconstruction of the following roadway segments: West Road 4 1/2 North between North Re ed Rd and North Road 1 West (3" AC / 6" ABC). Antelope Dr between West Perkinsville Rd and end of cul-de-sac (3" AC / 6" ABC). East Road 2 South between SR-89 and South Road 1 East (4" AC / 9" ABC). North Road 1 West between West Road 1 North and West Road 2 North (4" AC / 9" ABC)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents