Similar Projects
Coastal Seafood
New Construction, Addition - 8,270 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Woolford, MD 21677

Seagirt Marine Terminal
Conception
$32,800,000 est. value
Baltimore, MD

Marina Bulkhead Repair
Infrastructure
Bidding
Less than $30,000 est. value
Federalsburg, MD 21632

Boardwalk Redecking Labor
Infrastructure
Bidding
Ocean City, MD

Main Deck Replacement at ELMS Environmental Educational Center
Post-Bid
Less than $49,999 est. value
Lexington Park, MD 20653

Request for Information (RFI) Impact Pile Driving
Post-Bid
Patuxent River, MD

Replacement at Inspiration Lake
Results
Gaithersburg, MD 20878

Pier 10 Landside Stabilization at North Locust Point Marine Terminal - SBR Only
Results
$1,000,000 to $2,500,000 est. value
Baltimore, MD 21202

Four Seasons at Kent Island Phase II
New Construction - 26,566 SF
Construction
Centreville, Chester, MD 21619

Living Shoreline, Erosion Control, Kayak Launch And Stone Bulkhead & Improvements
Renovation
Pending Verification
Arnold, MD

Bulkhead, Piers, Pilings, and Boat Lifts
Renovation
Pending Verification
Annapolis, MD 21403

Deck Replacement Deep Creek Lake State Park
Alteration
Bidding
Less than $50,000 est. value
Swanton, MD 21561

Removal of Derelict or Abandoned Boats in Choptank Marina
Post-Bid
Denton, MD

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Bulkhead Replacement
Renovation
Pending Verification
Annapolis, MD

Last Updated 07/22/2021 09:17 AM
Project Title

Construction of a Marina

Physical Address View project details and contacts
City, State (County) Annapolis, MD 21403   (Anne Arundel County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $300,000
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This task includes all materials and labor necessary to construct docks with non-skip IPE or aluminum decking that are all 8’ wide with pilings enclosed by the docks and protected by 4- rollers. The pier lengths are: 132’ main pier; 104’ finger pier; 80’ T-head; and, two 35’ finger piers fitted for lifts in accordance with the permit drawings. Pilings shall be installed to support the finger pier spans as necessary such that no deflection occurs under typical loading. Black plastic cones shall be installed on top of the pilings. This is a commercial marina design primarily for people with disabilities and the construction shall meet or exceed ADA requirements. The marina is to be built with materials able to maintain their shape, look, and safety for several decades.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents