Reported | 01/07/2022 12:00 AM |
Project Title | Hunters Point Shipyard (Hillside) Switchgear Commissioning |
Physical Address | View project details and contacts |
City, State (County) | San Francisco, CA (San Francisco County) |
Category(s) | Professional Services |
Sub-Category(s) | Commissioning |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Perform an initial conditions assessment of the existing SFPUC primary switchgear located at Griffith Street and Crisp Road in San Francisco. 2. Perform commissioning tests on existing switchgear pursuant to PG&E Utility Bulletin for all required primary switchgear tests and requirements. 3. Where any deficiencies are discovered as a result of any commissioning tests, notify and advise SFPUC of any corrective action that must occur prior to any further testing. 4. If the testing is successful and no deficiency is found, prepare and submit a final primary switchgear commissioning report presenting the test results to PG&E (through SFPUC). 5. Prepare and complete all required commissioning forms pursuant to PG&E Utility Bulletin. 6. Perform protective device studies and submit time coordination curves and reports to PG&E (through SFPUC) as required. Device settings and SKM files from previous studies will be provided. 7. Coordinate timelines and schedules with SFPUC. Assist SFPUC in responding to PG&E requests and inquiries as they arise. 8. Provide digital copies of all test reports, protective device studies, and modified SKM files to SFPUC after the completion of work. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |