Similar Projects
Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

Seven Points Uptown
New Construction, Infrastructure, Renovation - 172,000 SF
Design
$150,000,000 CJ est. value
Minneapolis, MN 55408

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Grading, Bituminous Surfacing, Signing, TMS, and Lighting
Results

Bituminous Mill and Overlay
Results
Medina, MN

Quarter Lake West Apartments Phase I
New Construction
Construction
$224,000,000 est. value
Minneapolis, MN 55416

Bhatti GI Surgery Center
Demolition, New Construction, Infrastructure - 40,032 SF
Construction
$15,000,000 CJ est. value
Minneapolis, MN 55435

Cornelia View Apartments
Infrastructure, Renovation
Pending Verification
$33,000,000 CJ est. value
Minneapolis, MN 55435

Cornelia View Apartments
Infrastructure, Renovation
Pending Verification
$33,000,000 CJ est. value
Minneapolis, MN 55435

Road Right-of-Way Maintenance Equipment
Infrastructure
Post-Bid

CSAH 2 (Penn) Reconstruction at Northpoint
Results
MN

County Road 47 Reconstruction Phase 1
Infrastructure
Construction
$5,909,352 CJ est. value
Plymouth, MN 55446

Realignment of CSAH 92
Infrastructure
Post-Bid
Medina, MN

Site Improvements at Stewart Park
Results
Minneapolis, MN 55407

Last Updated 11/29/2022 02:14 PM
Project Title

Birch Bluff Road Street and Utility Improvements

Physical Address View project details and contacts
City, State (County) Shorewood, MN 55331   (Hennepin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $4,051,478 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of November 22, 2022, project was awarded to New Look Contracting awarded amount is $4,051,478.25. ** 9,700 Sq Yd Remove Bituminous Pavement 13,400 Cu Yd Common Excavation 2,800 Cu Yd Aggregate Base Class 5 2,500 Ton Bituminous Paving 2,500 Lin Ft Storm Sewer Pipe 1,200 Lin Ft 8" Dip Watermain 1,700 Sq Ft 6" Concrete Driveway 12,800 Sq Ft 3" Bituminous Driveway 7,600 Lin Ft Concrete Curb & Gutter Design B618 11,900 Sq Yd Hydroseed With 25-151 Pavement Resurface and Rehabilitation, Sidewalks/Curbs/Gutters, Stormwater Improvements, Street/Roadway Reconstruction , Paving (Highway, Road or Street)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents