Similar Projects
West Broad Street Water Main Replacement Project
Bidding
Less than $360,000 est. value
Telford, PA 18969

Fairview Avenue Main Replacement Project
Results
Sellersville, PA 18960

AMI System Installation
Results
$600,000 est. value
Morrisville, PA 19067

Furnish and Provide Services for Replacement of Existing Water Mains
Results
Levittown, PA

2020 Water Main Replacement
Results
$75,000 to $100,000 est. value
Morrisville, PA 19067

Central System Water Main Extensions
Results
$116,000 to $119,000 est. value
Doylestown, PA 18901

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Pressure Reducing Valve Vaults
Results
Sellersville, PA 18944

Village Park Water Quality Improvements Project
Results
Levittown, PA 19058

2020 Water System Improvements Project
Results
Less than $1,800,000 est. value
Ivyland, Warminster, PA 18974

Grove and Banks Street Water Main Replacement
Results
$175,000 to $200,000 est. value
Morrisville, PA 19067

Cherry Blossom Drive Watermain Extension
Results
$250,000 est. value
Richboro, PA 18954

Juniper Street Storm Sewer and Water Main Replacement
Results
Quakertown, PA 18951

2020 Water System Improvements Project - Phase 2
Results
$2,000,000 est. value
Warminster, PA 18974

2021 Infrastructure Improvement Project Group
Results
Lansdale, PA 19446

Last Updated 04/24/2020 10:11 AM
Project Title

Moland House Water Main Extension

Physical Address View project details and contacts
City, State (County) Warminster, PA 18974   (Bucks County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $408,364
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work involves the furnishing of all labor, materials, transportation, tools, supplies, and equipment necessary for the installation of approximately 930 linear feet of eight inch Ductile Iron Pipe water main. The water main extension begins from the existing eight inch stubbed water main located within the right of way of York Road (directly across from the Woodlands at Warwick Subdivision) continuing through the Moland House property and connecting to an existing eight inch ductile iron pipe water main on Old York Road near the intersection of Eddowes Road. Installation of the water main extension will involve the connection to existing eight inch ductile iron pipe water mains, pressure testing, and restoration to existing conditions. Work will also include installation of a pressure control valve vault within the adjacent Woodlands of Warwick subdivision. This valve vault will assist in controlling pressures between the two existing water mains.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents