Similar Projects
Houbolt Road Truck Stop
New Construction, Addition - 9,600 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
IL 60436

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Lockport Chrysler Dodge Ram & Jeep
New Construction - 34,100 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Lockport, IL 60441

F.O.B. County Garage
Infrastructure
Post-Bid
Joliet, IL

Asphalt
Infrastructure
Results
Joliet, IL

Ruby Street, Margaret Street and Will Center Road Water Main Improvements
Infrastructure
Results
Monee, IL

Rod Baker Ford
New Construction - 55,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Plainfield, IL 60586

Vetter Road Segment II Roadway Reconstruction & Realignment Drainage Improvements
Addition
Construction
Joliet, IL

Quick Trip Truck Stop
New Construction
Pending Verification
Joliet, IL 60435

Restaurant, Quick Trip & Hotel
Addition, Build-Out - 10,000 SF
Pending Verification
Romeoville, IL 60446

2021 Construction Projects
Infrastructure
Post-Bid
Joliet, IL

Stony Island Avenue Pavement
Infrastructure
Results
IL

Belle Tire
New Construction - 12,500 SF
Construction
$1,200,000 est. value
Romeoville, IL 60446

Quick Trip
New Construction - 8,292 SF
Pending Verification
Joliet, IL 60436

Truck Travel Center
New Construction
Post-Bid
Peotone, IL 60468

Last Updated 03/21/2023 10:37 AM
Project Title

Penske Truck Collision Repair

Physical Address View project details and contacts
City, State (County) Channahon, IL 60410   (Will County)
Category(s) Commercial, Heavy and Highway, Sewer and Water
Sub-Category(s) Gas Station, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Vehicle Sales/Service, Water Lines
Contracting Method Bids by Invitation
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $7,763,400 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 21, 2023, this project is in design. An architect has been selected. Information on the general contractor has not been released. A firm construction timeline has not been established at this point in time. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

34,200 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents