Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Z1dz--T1/ Project 554-22-136 Relocate Power for Patient Transport Cart Chargers (Va-22-00023703)
Term Contract
Design
$50,000 to $100,000 est. value
Aurora, CO 80045

Scissor Lifts
Alteration
Post-Bid
Aurora, CO

Switchgear Testing and Maintenance
Alteration
Post-Bid
Aurora, CO

Eaton, Cutler Hammer, and Key Stone Electrical Equipment and Parts
Term Contract
Results
$60,000 to $70,000 est. value
Aurora, CO 80012

Robertsdale Solar Project
Results
Aurora, CO

Government Center Switch Upgrade
Alteration
Post-Bid
Brighton, CO

Misc. Electrical and Lighting
Results
Brighton, Denver, CO 80216

UPS4 Battery Replacement
Alteration
Post-Bid
Denver, CO

Ikaa007 Dys Nightlight Installation (Calm)
Results
Less than $21,000 est. value
Golden, Lakewood, CO 80401

Electrical Services
Alteration
Post-Bid
Aurora, CO

UPS Units and Standalone Cabinets
Results
Aurora, CO

City Hall Lighting
Infrastructure
Post-Bid
Brighton, CO

Electrical Systems Upgrade
Alteration
Results
Denver, CO

Event Lighting, Sound and Electrical Services
Term Contract
Post-Bid
Thornton, CO

Last Updated 06/17/2022 07:05 AM
Project Title

Electrical Transmission Service Substation - CMAR Contractor Selection

Physical Address View project details and contacts
City, State (County) Denver, CO 80229   (Adams County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor to provide preconstruction and construction services related to the Electrical Transmission Service Substation Project (project) at the Robert W. Hite Treatment Facility (RWHTF) located at 6450 York St. Denver, CO. Contractor is expected to work collaboratively with Metro, and Metro’s design engineer to optimize and better define schedule, project costs, construction impacts on stakeholders, design details and other advantages that result from use of the CMAR process. The Project will include the design and construction of a new 115kV Electrical Service Substation interconnected to a new Xcel-owned 115kV Switchyard located adjacent to the substation, replacement of two existing 15kV switchgear facilities, relocation of two transformers, and modifications to the existing 15kV distribution system.

Details

Division 26 - Electrical, Substations.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents