Similar Projects
Municipal Building Renovation - FA-16-001 - City of Cheyenne
Build-out - 53,000 SF
Conception
$2,500,000 CJ est. value
Cheyenne, WY 82001

Replace Municipal Complex Irrigation System - FA-17-001 - City of Cheyenne
Infrastructure
Conception
$400,000 CJ est. value
Fe Warren Afb, WY 82005

Installation Services - Cheyenne
Renovation
Design
$302,343 CJ est. value
Cheyenne, WY 82001

Pre-Cast Concrete Vault Restrooms in the Cody Region
New Construction, Infrastructure
Bidding
$377,000 CJ est. value
Mills, WY 82604

Cheyenne Aquatic Center Slide Restoration
Renovation
Bidding
$75,000 CJ est. value
Cheyenne, WY 82001

Rapid Response Single Award Task Order Contract (SATOC)
New Construction
Post-Bid
Less than $95,000,000 est. value

Rapid Response Single Award Task Order Contract (SATOC)
New Construction
Post-Bid
Less than $95,000,000 est. value

2022 Construction Contract
Renovation, Term Contract
Results
Jackson, WY

Solid Waste Storm Water Improvements
Infrastructure
Results
$177,500 CJ est. value
Evansville, WY 82636

Wyoming State Fair Master Plan
Term Contract
Pending Verification
Cheyenne, WY 82001

City Shop West Yard - City of Worland Public Works
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Worland, WY 82401

Weston County Solid Waste District New Landfill
Infrastructure
Conception
$5,000,000 CJ est. value
Newcastle, WY 82715

Cheyenne Ice and Events Center Evaporative Condenser Replacement
Renovation
Bidding
$55,000 CJ est. value
Cheyenne, WY 82001

Jackson Hole Airport Hangar 3 and GSE Building
Renovation - 39,400 SF
Post-Bid
Jackson, WY

Coffman Avenue Repairs Skyridge to W. 25th Street
Infrastructure
Results
$1,972,627 CJ est. value
Casper, WY 82604

Last Updated 06/06/2023 05:18 AM
Project Title

Scale House Replacement - Teton Pass

Physical Address View project details and contacts
City, State (County) Jackson, WY 83001   (Teton County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

https://buckrail.com/county-receives-300k-for-teton-pass-project-planning-efforts-to-begin/ The County announced today that it was awarded $300,000 from the Federal Land Access Program (FLAP) to begin planning efforts that will go toward improving transportation, outdoor recreation access, and wildlife safety on Teton Pass. "Teton Pass is a critical transportation corridor that also traverses extraordinary public lands access and wildlife habitat," said Teton County Engineer Amy Ramage. "This grant will allow us to develop a cohesive plan to address unprecedented levels of recreation and commuter use, while also looking at ways to reduce wildlife/vehicle collisions and improve pedestrian safety." Recreation use of this corridor, both during the winter and summer, has risen sharply since the early 1990s. Multiple trailhead facilities provide access to high-use recreation trails during the summer and exceptional backcountry terrain in the winter but they come at a price. As commuter and commerce traffic has also rapidly increased, parking congestion, conflict, and safety concerns, plague the area. "Teton Pass winter recreation has reached a boiling point with overcrowded parking areas, skier-triggered avalanches blocking Wyoming Highway 22 and public safety concerns," said Jackson District Ranger Mary Moore. The Bridger-Teton National Forest, along with the Caribou-Targhee National Forest, manages most of the public land adjacent to Highway 22, which splits the pass. Both forests, Teton County, Wyoming, the Wyoming Department of Transportation (WYDOT), and advocacy groups, Wyoming Pathways, and the Teton Backcountry Alliance have shared ideas and suggestions on how to balance the demands of Teton Pass. "Use of this area is not going to decrease so we need to develop a solid corridor management plan that looks at the issues holistically from Idaho to Wyoming," said Jay Pence, Teton Basin District Ranger for the Caribou-Targhee National Forest. The escalating conflict between pedestrian safety and the highway corridor prompted Teton County to apply for the national grant. The conceptual plan proposes design elements to improve pedestrian safety in the highway corridor, clearly define and separate recreation parking from highway maintenance and emergency needs and improve the recreation experience by reducing conflict and improved signage. Wildlife vehicle collisions are also a safety and ecological concern and synergy with implementing solutions proposed in the Teton County Wildlife Crossings Master Plan will be considered in this effort. Maintenance of the highway and the adjacent recreational trailheads is currently a multi-jurisdictional responsibility. WYDOT maintains the highway including significant avalanche control, plowing, removing rockfall, pavement preservation, and replacing damaged highway signs and guardrails. The Forest Service, in conjunction with partners, installs and maintains recreation signing, removes trash, maintains trails and campsites, and provides on-site educational patrols. Teton County plows and maintains the Trail Creek road and trailhead. A report published by WYDOT references the long history of safety concerns associated with the pass and the need for designated parking that can be used for recreational use as well as avalanche mitigation. The long, wide, and uncontrolled access points at the summit parking are a source of many near misses with pedestrians and vehicles on the highway. The Federal Lands Access Program was established to improve transportation facilities that provide access to Federal lands. FLAP supplements State and local resources for public roads with an emphasis on high-use recreation sites and economic generators. With up to 200,000 visitors a year, three major trailheads, and thousands of acres of public lands affected, officials say that this project easily fit the bill. __________________________________________________________________ "As per the Owner all bids have been rejected. Editorial Content Team is actively seeking updated information". Any specification questions should be directed to Hans Hehr, at Telephone No. (307) 777-4398 or at the following E-Mail Address dot-procurement-services@wyo.gov. WYDOT - Scale House Replacement - Teton Pass

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents