Similar Projects
Technology Place Street Extension - TR0120 - City of Norman
Infrastructure
Conception
$550,000 CJ est. value
Norman, OK 73071

Effluent Truck Wash Facility - SA0015 - City of Norman
Infrastructure
Conception
$492,950 CJ est. value
Norman, OK 73069

Grade, Drain and Surface - IS 35
Infrastructure
Design
$10,000,000 CJ est. value
Norman, OK 73069

Grade, Drain and Surface - IS 35
Infrastructure
Design
$10,000,000 CJ est. value
Norman, OK 73069

District 2 Luther Road Bridge Repair (N Canadian River & Railroad Bridge)
Infrastructure
Bidding
$3,000,000 CJ est. value
Oklahoma City, OK 74857

Lake Thunderbird Access
Infrastructure
Bidding
$5,000,000 CJ est. value
Norman, OK 73026

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

Porter Avenue Waterline Replacement Phase II
Infrastructure
Results
Norman, OK

Moore Animal Shelter - Bid Package #1
New Construction, Infrastructure - 47,629 SF
Results
$6,492,069 CJ est. value
Moore, OK 73160

Summit Valley Interceptor - City of Norman
Infrastructure
Pending Verification
$284,600 CJ est. value
Norman, OK 73069

Summit Valley Interceptor - City of Norman
Infrastructure
Pending Verification
$284,600 CJ est. value
Norman, OK 73069

I-44 - Utilities
Infrastructure
Conception
$885,851 CJ est. value
Norman, OK 73026

Utilities - US 77
Infrastructure
Design
$1,250,000 CJ est. value
Noble, OK 73068

Test Holes and New Water Supply Well (17)
Infrastructure
Bidding
$400,000 CJ est. value
Lexington, OK 73051

Last Updated 03/31/2023 05:03 PM
Project Title

Sanitary Sewer Stream Crossing Replacement State Highway 9 Between Chautauqua and Jenkins

Physical Address View project details and contacts
City, State (County) Norman, OK 73026   (Cleveland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $593,630 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 15, 2023 , this project has not yet been awarded. The project is expected to be awarded on March 28, 2023. Each bid must be submitted in a sealed envelope bearing on the outside the name of the bidder, his/her address, and the name of the project for which the bid is submitted. If sent by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed as stated above. All blank spaces for bid prices must be filled in, in ink or typewritten, and in both words and figures. Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays and holidays, before the time set for opening the bids, as well as bids received after the time set for receipt of bids, WILL NOT be considered and will be RETURNED UNOPENED. A cashier's check, a certified check, or a surety bond in the amount of five percent (5%) of the bid shall accompany the sealed proposal of each bidder. Deposits will be returned to the unsuccessful bidders. Each bid submitted is a legal offer and when accepted by the NUA, constitutes a FIRM AND BINDING CONTRACT. The OWNER reserves the right to REJECT ANY or ALL BIDS. The OWNER further reserves the unconditional right to cancel all or any portion of this project within sixty (60) days from the date of opening of bids, for any reason and at its sole discretion. The Norman Utilities Authority (NUA) is exempt from the payment of any sales or use taxes. Pursuant to Title 68 O.S., Section 1356 (10) and as allowed by Oklahoma Tax Commission Rules Part 27 Trust Authority 710:65-13-140, direct vendors to the NUA are also exempt from those taxes. A bidder and his subcontractors may exclude from their bid sales taxes on appropriate equipment, materials, and supplies incorporated into the project and purchased by the NUA through the bidder. The bidder and his subcontractors will coordinate such purchases with the NUA. Questions concerning the bid or project requirements should be directed to Ken Giannone, PE at kenneth.giannone@normanok.gov or 405-366-5377.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents