Similar Projects
Strategic Planning and Operational Flexibility (SPOF) Support
Term Contract
Design
Saint Marys, GA - Bangor, WA 31558

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Design
Less than $98,000,000 est. value

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

Rfq Multiple Engineering Service
Term Contract
Bidding

Water System Zone Intertie Design Preparation
Infrastructure
Post-Bid

On-Call Geotechnical Engineering Consulting Services
Term Contract, Infrastructure
Post-Bid
$150,000 est. value
WA

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Request for Qualifications (Architectural and Engineering Services)
Term Contract
Bidding

Engineering Consultant Services for On-Call Geotechnical Services
Term Contract
Post-Bid
WA

COBI Storm Water System Plan
Infrastructure
Bidding
$200,000 est. value
Bainbridge Island, WA

6th Street Pavement Preservation Phase III
Term Contract, Infrastructure
Post-Bid
Bremerton, WA 98337

Winslow Water Tank Replacement
Infrastructure
Bidding
Bainbridge Island, WA

Electrical Engineering Services
Infrastructure
Post-Bid

Regional A-E Environmental Services
Renovation, Term Contract
Bidding

Reported 11/18/2021 12:03 PM
Project Title

Winslow Water Tank Replacement Project

Physical Address View project details and contacts
City, State (County) Bainbridge Island, WA   (Kitsap County)
Category(s) Professional Services, Sewer and Water
Sub-Category(s) Engineering, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Bainbridge Island is seeking an engineering consultant for the design of the demolition and replacement of the City’s 1 MG standpipe reservoir with a 2 MG elevated tank reservoir.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents