Similar Projects
Central Park - Lot 2
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
O Fallon, IL 62269

Central Park - Lot 2
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
O Fallon, IL 62269

Public Safety Building at Emerson Park Metro Station
New Construction, Infrastructure - 16,113 SF
Bidding
$15,000,000 CJ est. value
East Saint Louis, IL 62201

Market Place Streetscape - Phase 2 Roundabout Landscape and Lighting
Infrastructure
Bidding
$4,793,000 CJ est. value
Fairview Heights, IL 62208

New Storage Building
New Construction, Infrastructure
Sub-Bidding
$300,000 CJ est. value
O Fallon, IL 62269

Aggregate
Post-Bid
Freeburg, IL

Roadway Chip Seal
Alteration
Post-Bid
Belleville, IL

Millstadt - PY 2019 CDBG - Laurel Street Improvements - 600 and 700 Block - Phase 1
Results
Less than $95,000 est. value
Millstadt, IL

Building Demolition and Site Work - AMP 3
Demolition
Results
Centreville, IL

Brandywine Garden Villas
New Construction, Infrastructure - 62,622 SF
Pending Verification
$75,000,000 CJ est. value
O Fallon, IL 62269

Jackie Joyner Kersee Sports and Recreation Complex
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
East Saint Louis, IL 62204

Central Park - Lot 3
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
O Fallon, IL 62269

2022 Street Improvements
Infrastructure
Bidding
$450,000 CJ est. value
East Saint Louis, IL 62201

Aggregate
Term Contract
Post-Bid
Fairview Heights, IL

Resurfacing of 400 Block of North Virginia Ave
Results
Belleville, IL 62220

Last Updated 09/12/2022 01:36 PM
Project Title

Central Park - Lot 1

Physical Address View project details and contacts
City, State (County) O Fallon, IL 62269   (Saint Clair County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the phased construction of a mixed-use development: Lot 1 will consist of four three-story apartment buildings with 26 units each Lot 2 will consist of commercial, possible restaurant space, with one drive-thru and others with alcohol sales, plus retail, or an entertainment destination Lot 3 will consist of a four-story, 94-room hotel Lot 4 will consist of a four-story apartment building with 240 units As of September 12, 2022, architectural plans are being finalized. An architect and general contractor have been selected. Information regarding subcontractor bidding opportunities has not been released. Dirt work will commence in fall 2022. Although a firm timeline for construction has not been solidified, Lot 1 is expected to begin construction in March or April 2023.

Details

3 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents