Similar Projects
Construction of Elevated Storage Tank Recoating
Infrastructure
Bidding
$337,000 est. value
TX

Water Plant No. 6 Ground Storage Tank Replacement
Infrastructure
Bidding
Alvin, TX

Preventive Maintenance, Repair and Tank Cleaning of Asphalt Storage Tanks
Term Contract
Post-Bid

J035--RFI-Sources Sought Thermal Energy Storage Tank Repair
Post-Bid
Houston, TX 77030

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Terrell Unit Water Tank
Infrastructure
Bidding
Rosharon, TX 77583

Repair of Unit 43578
Infrastructure
Post-Bid
Houston, TX

Southdown Plant Ground Storage Tank Replacement
Results
Less than $1,750,000 est. value
Pearland, TX

530 Gallon Stainless Steel Rainwater Catchment System
Infrastructure
Post-Bid
Houston, TX

Mechanical Services for Water and Wastewater Plants and Lift Stations
Results
Less than $380,000 est. value
Pearland, TX

Liberty and Mclean Elevated and Ground Storage Tank Rehabilitation
Infrastructure
Post-Bid
Pearland, TX

Rehabilitation of the Balsam 500,000 Gallon Elevated Water Storage Tank
Results
Less than $575,000 est. value
Lake Jackson, TX

J046--New - STX Water Softener Re-Bedding
Term Contract
Results

Mechanical Contractor Services
Term Contract
Results
Houston, TX

Last Updated 11/12/2021 10:57 AM
Project Title

Terrell Unit Replace Hot Water Storage Tank and Heat Exchangers - Room 529

Physical Address View project details and contacts
City, State (County) Rosharon, TX 77583   (Brazoria County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Mechanical, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish and install all equipment and associated parts necessary to complete this project per project drawings, specifications, and manufacturer’s recommendations including but not limited to the following: A. Install temporary hot water generator. B. Remove three steam to water heat exchangers on elevated platform and associated piping valves and fittings. C. Remove old hot water storage tank. D. Remove the elevated platform, walkway, and ladder supporting the old heat exchangers. E. Install new hot water storage tank and associated piping, valves and fittings. F. Install three new steam to water heat exchangers with ground support stand and associated piping valves and fittings. G. Replace additional piping, fittings, and components as needed to ensure system startup, mechanical integrity, and reliability for the warranty period. Associated parts may include piping, steam pressure regulating valve, temperature control valves, steam traps, pressure relief valves, and inline circulating pump.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 22 - Plumbing, Domestic Water Heat Exchangers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents