Similar Projects
Water Heater Replacements
Renovation
Sub-Bidding
$611,900 CJ est. value
East Brunswick, NJ 08816

Furnishing of Preventative Maintenance Service and Repairs on Cleaver Brooks Boilers
Term Contract
Sub-Bidding
New Brunswick, NJ 08901

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

Air Filters
Alteration
Post-Bid
NJ

Boiler/Burner Cleaning and Preventative Maintenance
Results
Monmouth Junction, NJ

Cooling Tower Replacement at Piscataway Campus
Alteration
Results
Piscataway, NJ 08854

Temporary Removal, Storage, and Future Reinstallation of Specified Solar Panels at Various Locations School Year 2022 - 2023
Renovation
Construction
$152,000 CJ est. value
Woodbridge, NJ 07095

HVAC Upgrades at Multiple Schools - Sayreville War Memorial High School Harry S. Truman Elementary School
Renovation
Sub-Bidding
$100,000 CJ est. value
Sayreville, NJ 08859

HVAC Equipment
Term Contract
Post-Bid
East Brunswick, NJ

HVAC Digital Controls Upgrade
Alteration
Results
Edison, NJ

Boiler Maintenance / Repair Contractor
Term Contract
Sub-Bidding
Woodbridge, NJ 07095

Piscataway Township Schools: Proposed ESCO Energy Savings Improvements
Alteration
Post-Bid
Piscataway, NJ 08854

HVAC and Boiler Equipment Maintenance, Repair and Replacement
Alteration
Results
Sayreville, NJ

HVAC Maintenance
Alteration
Post-Bid
Plainsboro, NJ

Woodbridge Community Center Ice Rink Refrigeration System Maintenance and On-Call Repair
Alteration
Results
Woodbridge, NJ

Last Updated 02/28/2023 03:13 AM
Project Title

Boiler Replacement at Von E. Mauger Middle School Project

Physical Address View project details and contacts
City, State (County) Middlesex, NJ 08846   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $798,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Bid Security shall be in the amount of ten percent (10%) of the Bid, but not in excess of Twenty Thousand Dollars ($20,000.00), and payable to the order of the "Middlesex Board of Education". Bids shall be submitted on the provide proposal forms and be accompanied by a certified check, cashier's check of bid bond draw to the order of the "Middlesex Board of Education" for not less than ten percent (10%) of the bid, but in no case in excess of Twenty Thousand Dollars ($20,000.00). Bid securities shall comply with N.J.S.A. 18A:18A-24. A New Jersey Statutory Performance Bond and Labor and Material Payment Bond in accordance with applicable New Jersey law as it applies to bonding, from a surety company approved and authorized to do business in the State of New Jersey and satisfactory to the Board, in the amount of one hundred percent (100%) of the contract sum, shall be delivered simultaneously with the executed Contract. Completion Date: Substantial Completion: August 4, 2023. Final Completion: 30 days after Substantial Completion

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents