Similar Projects
Well Rehabilitation at Edgar Water Well - WA2202 - City of Richmond
Renovation, Infrastructure
Conception
$331,000 CJ est. value
Richmond, TX 77469

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Water Well Project for Fort Bend County - Beasley
Renovation, Infrastructure
Design
$2,000,000 CJ est. value
Beasley, TX 77417

Fort Bend County Levee Improvement District No. 2 - Third Storm Water Pump Station - Bid Package 4C - Building Interior
Renovation
Bidding
$200,000 CJ est. value
Sugar Land, TX 77479

Fort Bend County Municipal Utility District No. 2 Lift Station No 1 Improvements
Renovation, Infrastructure
Bidding
$1,000,000 CJ est. value
Sugar Land, TX 77479

Houston Public Media Generator, UPS, and BAS Replacement
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Missouri City, TX 77489

FM 1464 - Install/upgrade Roadway Lighting
Infrastructure
Sub-Bidding
$1,849,006 CJ est. value
Richmond, TX 77407

Water Plant No. 1 and No. 2 MCC and Generator Replacement
Post-Bid
Less than $1,260,000 est. value
TX

Term Contract For Electrician Services
Term Contract
Post-Bid
$50,000 est. value
Fulshear, TX

Booster Pump Replacement
Results

Lift Station Control Panel Replacement Project
Results
Sugar Land, TX 77487

Soldiers Field Water Well, Great Oak Water Well, and River Park Water Well Rehabilitation
Infrastructure
Bidding
$1,466,000 CJ est. value
Sugar Land, TX 77479

Hanger Fans
Term Contract
Post-Bid

Lift Station Rehabilitation for Elkins (No. 24), Baybridge (No. 28), Commonwealth (No. 30) and Auburn Trails (No. 401)
Results
Less than $1,657,000 est. value
Sugar Land, TX 77479

On-Site Lift Station Expansion at the Wastewater Treatment Plant
Addition, Demolition, Renovation, Infrastructure
Bidding
$185,000 CJ est. value
Fulshear, TX 77441

Last Updated 08/10/2022 12:55 AM
Project Title

Lift Station No. 3 Generator Replacement

Physical Address View project details and contacts
City, State (County) Richmond, TX 77406   (Fort Bend County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $124,869 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition, removal, and disposal of existing natural gas generator and generator foundation; Install 70 kW Natural Gas Emergency Generator including Foundation with Sound Attenuating Enclosure, replacement of conductors, modification of existing controls, and necessary electrical components and all appurtenances for a complete emergency electrical power system for Lift Station No. 3, in accordance with plans and specifications; Site restoration and hydromulching. Complete in place. There is no pre-bid conference associated with this project.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Packaged Generator Assemblies.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents