Similar Projects
Improve Us-119 From North of Ky-15 to Brass Drive (South)
Infrastructure
Conception
$10,060,000 CJ est. value
Whitesburg, KY 41858

Improve Us-119 From North of Ky-15 to Brass Drive (South)
Infrastructure
Conception
$10,060,000 CJ est. value
Whitesburg, KY 41858

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Fleming-Neon Sewer Rehabilitation Project, Contract 2
Infrastructure
Bidding
$716,000 CJ est. value
Fleming, KY 41840

Asphalt Resurfacing - Shelby Gap Road
Infrastructure
Post-Bid
$933,177 CJ est. value
Thornton, KY 41855

Asphalt Resurfacing - Shelby Gap Road
Infrastructure
Post-Bid
$933,177 CJ est. value
Thornton, KY 41855

Highway 119 N(US 119) (MP 26.117) - Asphalt Resurfacing
Infrastructure
Results
KY

Jenkins - Shelby Gap Road(KY 805) (MP 9.246) - Asphalt Resurfacing
Infrastructure
Results
KY

Waterline Improvement Project Phase 1
Infrastructure
Post-Bid
$900,000 CJ est. value
Fleming, KY 41840

Asphalt Resurfacing - US 119
Infrastructure
Results
$300,000 est. value
Whitesburg, KY 41858

Water Line Replacement and Water Tank Project - Contracts 1, 2, and 3
Infrastructure
Post-Bid
$300,000 CJ est. value
Whitesburg, KY 41858

Disaster Repairs
Renovation, Infrastructure
Post-Bid
$500,000 CJ est. value
Fleming, KY 41840

Disaster Repairs
Renovation, Infrastructure
Post-Bid
$600,000 CJ est. value
Jenkins, KY 41537

Disaster Repairs
Renovation, Infrastructure
Post-Bid
$350,000 CJ est. value
Jenkins, KY 41537

Asphalt Paving Contractor
Infrastructure
Post-Bid
$300,000 CJ est. value
Jenkins, KY 41537

Last Updated 03/14/2023 08:02 AM
Project Title

Improve Safety on Us-119 Through the Gateway Industrial Park to Us-23, Including Us-23 Flyover Ramp

Physical Address View project details and contacts
City, State (County) Whitesburg, KY 41858   (Letcher County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2026
Bids Due View project details and contacts
Estimated Value $18,340,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improve Safety on Us-119 Through the Gateway Industrial Park to Us-23, Including Us-23 Flyover Ramp.(16ccn) Milepoints: From MP 25.122 To 27.728 Purpose and Need: Reconstruction As of March 14, 2023, the project is in Conceptual status. Anticipated Letting Year is 2026. KYTC - Improve Safety on Us-119 Through the Gateway Industrial Park to Us-23, Including Us-23 Flyover Ramp *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents