Similar Projects
Savannah Harbor - Infrastructure - Phase I
New Construction
Conception
$130,000,000 est. value
Savannah, GA 31421

Twin Pines Minerals
New Construction
Conception
Folkston, GA 31537

Site Repair Thompson Stadium
Bidding
Macon, GA

Runway 35 RPZ Clearing, Minor Grading and Fencing
Bidding
Valdosta, GA 31601

Winder Retail Center - Site
New Construction
Sub-Bidding
Winder, GA

RCPS Central Office Complex Site and Roof
Post-Bid
Conyers, GA

Building Demolition and Site Improvements at William Hubbard School
Demolition
Post-Bid
Forsyth, GA 31029

Walking Trail at Meridian Park
Results
Loganville, GA 30655

General Contractor Site Clearing and Grading for New Athletic Field Saddle Ridge Elementary and Middle School
Results
Less than $1,118,000 est. value
Rock Spring, GA 30739

Perimeter Marketplace
New Construction - 60,400 SF
Construction
Dunwoody, GA 30338

Kipp Vision Modular Health Clinic
New Construction
Construction
Atlanta, GA 30315

Crowning of High School Football Practice Field
Bidding
Monticello, GA 31064

Terminal Area Site Improvements - Phase 2
Post-Bid
Dawson, GA 39842

Jeff Davis County BOE Site Work
Results
Hazlehurst, GA

CVS #4190
Construction
Toccoa, GA 30577

Last Updated 05/27/2020 04:41 PM
Project Title

188 MLK Practice Facility Site Improvements

Physical Address View project details and contacts
City, State (County) Atlanta, GA   (Cobb County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $850,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing site currently houses the football practice field (runs east/west) and 7,000 SF weight room facility. The existing weight room building will be demolished. Other football-related outdoor equipment will be removed in order to provide enough space for the 360’ x 211’ 6” new grass field to run north/south on the east side of the building. Please also see “Exhibit D” for reference. The site improvements scope includes: Demolish 7,000 SF pre-engineered metal panel building / slab and HVAC equipment with pads General site work including grading to sub base level, drainage, and stormwater management systems – site work to prepare for new grass playing surface that will be installed Installation of 40’ poles with foundations and netting surrounding the playing field Demolition of 2 existing goal posts, 2 existing light poles, and 4 net support posts Relocation of existing camera stand platform to mid-field side line Installation of 4 light pole foundations and bases, ready for lighting consultant to place light poles and aim lights Run electrical conduit to the light poles and install contactor cabinet for future connection to light pole scope; run electrical conduit to future scoreboard New retaining wall on southwest portion of the site, new chain link fencing on the new portion of the retaining wall to connect with existing chain link fence Installation of 6’ padding on the east side of the building, around the bases of the poles

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents