Similar Projects
Katy Elementary School Renovation
Renovation
Conception
$22,900,000 est. value
Katy, TX 77493

Elementary School #46
New Construction
Design
$37,616,317 est. value
Katy, TX

Bernard Clifton Terrell Elementary School #31
New Construction
Bidding
$26,700,000 est. value
Richmond, TX

Construction of New Elementary School #53 - Package "B" and Package "C"
New Construction - 134,518 SF
Post-Bid
$10,000,000 CJ est. value
Missouri City, TX

New Elementary School No 43
New Construction
Results
Less than $28,915,118 est. value
Katy, TX

Disaster Recovery Services
Results

New Tamarron Elementary School
New Construction - 94,978 SF
Construction
Less than $21,050,000 est. value
Rosenberg, TX

Construction Management Services 2018 Bond Program PKG009 Elementary School 53
New Construction
Construction
Less than $32,282,486 est. value
Missouri City, TX

2020 Bond New Facilities Construction
New Construction
Pending Verification
$424,958,811 est. value
Rosenberg, TX

2020 Bond Project for Interior Improvements
Addition
Pending Verification
$87,688,250 est. value
Rosenberg, TX

Construction Management Services 2018 Bond Program PKG006 Lakeview Elementary Rebuild
Construction
Less than $23,512,412 est. value
Sugar Land, TX 77498

2020 Bond Program for Fine Arts Classrooms Additions
Renovation, Addition
Pending Verification
$12,740,968 est. value
Rosenberg, TX

Neill Elementary School Building Additions
Addition
Construction
Less than $4,865,087 est. value
Richmond, TX 77406

Construction Of New Elementary School #53 - Package A
New Construction - 134,518 SF
Construction
$32,282,486 est. value
Missouri City, TX

Maxine Phelan Elementary School (#30)
New Construction - 105,679 SF
Construction
$24,600,000 est. value
Richmond, TX

Reported 12/28/2021 09:24 AM
Project Title

Madden Elementary School - 10 Classroom Addition PKG005

Physical Address View project details and contacts
City, State (County) Richmond, TX 77407   (Fort Bend County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method
Project Status Construction Complete as of third quarter 2021
Bids Due View project details and contacts
Estimated Value $5,465,309
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes but not limited to completion of Madden Elementary School - 10 Classroom Addition (PKG005). 1. Structural steel structural framing 2. Steel framed exterior walls with brick masonry veneer 3. Roof membrane over insulated roof deck 4. Aluminum framed windows, entry doors and insulated glazing 5. Drywall, acoustical and interior finishes 6. Plumbing, HVAC, electrical and life safety systems 7. Automatic fire sprinkler system 8. Related site work for grading, drainage, paving and landscaping.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents