Similar Projects
Pipe Removal and Replacement
Infrastructure
Bidding
NC

Corrugated Aluminized Pipe
Infrastructure
Bidding
Raleigh, NC

Drainage System Repairs for the Guinea Mill Watershed Improvement Service District
Post-Bid
Currituck, NC 27929

Burlington Alamance Regional Airport Outfall - Contract 2020-12
Post-Bid
Burlington, NC 27215

Emergency Watershed Protection Program - Recovery
Results
New Bern, NC

Cross Creek Hurricane Repair and Bank Stabilization
Results
Fayetteville, NC 28301

Hdpe Pipe
Infrastructure
Bidding
Burgaw, NC 28425

Erosion Control Material for Lodge Road Project
Post-Bid
Rocky Point, NC 27699

East Park Avenue, East Stewart Avenue, North Church Street Infrastructure Project
Results
Mooresville, NC 28115

Elm Street Drainage Project
Post-Bid
Nashville, NC 27856

Atlantic Harbor Maintenance Dredging and Living Shoreline
Results
Less than $1,949,188 est. value
Beaufort, NC 28516

Concrete Pipe
Post-Bid
Winston-Salem, NC 27102

Orange High School Athletic Improvements and Pathways Elementary Drainage
Results
Hillsborough, NC 27278

CAPE Emerald Subdivision Pond Outlet Structure and Pipe Relocation
Post-Bid
Emerald Isle, NC 28594

Three Mile Branch Spot Stabilization - McGee Park
Results
$70,297 est. value
Concord, NC

Last Updated 08/24/2021 08:21 AM
Project Title

Swann Intake Bank Stabilization

Physical Address View project details and contacts
City, State (County) Winston Salem, NC   (Forsyth County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes but is not limited to the installation of riprap stabilization and new warning signs at two locations along the Yadkin River, and the installation of rock wall veneer against existing gabions. Other aspects of the project include, but are not limited to, the removal of existing signs, the installation of geobag wall solutions, planting, road repair, fence and gate installation, and riprap placement.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents