Similar Projects
Willmore Park - City of St. Louis
Infrastructure
Conception
$1,100,415 CJ est. value
Saint Louis, MO 63109

The Beacon on Chestnut
New Construction, Renovation, Infrastructure
Conception
$25,000,000 CJ est. value
Saint Louis, MO 63101

Moxy Hotel by Marriott / Saint Louis
New Construction, Infrastructure
Design
$16,500,000 CJ est. value
Saint Louis, MO 63101

Olive West Residential
New Construction, Renovation, Infrastructure
Design
$25,000,000 CJ est. value
Saint Louis, MO 63108

DGR Loop Trolley ADA Tile Repair
Infrastructure
Bidding
$100,000 CJ est. value
Saint Louis, MO 63103

Sherwood Dr. #2790 Storm Sewer
Infrastructure
Bidding
$167,000 CJ est. value
Saint Louis, MO 63103

Phase I - Center Redevelopment Welcome and Wellness Center
Demolition, New Construction, Infrastructure - 24,100 SF
Post-Bid
$10,000,000 CJ est. value
Saint Louis, MO 63120

Mississippi Greenway Arch Security Upgrades
Renovation, Infrastructure
Post-Bid
$200,000 CJ est. value
Saint Louis, MO 63160

Police Precinct 1 - St. Louis County - Rebid
New Construction, Infrastructure - 17,224 SF
Results
$9,526,000 CJ est. value
Saint Louis, MO 63103

Forest Park Round Lake Renovation
Infrastructure
Results
$797,339 CJ est. value
Saint Louis, MO 63112

Cervantes Convention Center Expansion and Modernization Project 1
Addition, Demolition, Renovation, Infrastructure
Construction
$123,867,709 CJ est. value
Saint Louis, MO 63101

Puttshack - City Foundry / Saint Louis
Demolition, Infrastructure, Build-out - 25,000 SF
Construction
$5,000,000 CJ est. value
Saint Louis, MO 63110

Ponce Health Sciences University Medical School
New Construction, Infrastructure - 150,000 SF
Pending Verification
$80,000,000 CJ est. value
Saint Louis, MO 63101

Fanning Middle School Building Conversion
Renovation
Pending Verification
$6,000,000 CJ est. value
Saint Louis, MO 63116

Preservation Square Phase 5 (Brewery Apartments)
Demolition, Infrastructure, Renovation
Design
$34,741,376 CJ est. value
Saint Louis, MO 63106

Last Updated 09/15/2023 06:06 PM
Project Title

Marquette Homes - Part 4

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63118   (Saint Louis City County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $9,000,000 [brand] Estimate
Plans Available from Negotiating General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of the renovation of a three-story historic building. Scope includes selective demolition, masonry restoration, roofing, carpentry, MEP, drywall, interior finishes, and appliances. PLEASE NOTE: - Contractors may bid on all or part(s) of the bid package. Please show clearly in the bid submission which part(s) are being bid on. - Please show sales tax separate from your base bid. - This project IS prevailing wage, and certified payroll reporting may be required to Missouri Housing Development Commission and to the City of St. Louis in The Headcount worker tracking system. - Section 3 applies to this project. --- Work hour goals apply to this project as follows (a worker's hours may count toward more than one applicable category) (The City of St. Louis will track worker hours on site using The Headcount system, and subcontractors will be required to certify tracked hours in The Headcount): ------Section 3 Certified Workers: 25% of all work hours ------Apprentices in U.S. Department of Labor-Approved Apprenticeship Program: 20% of all work hours ------Minorities: 25% of all work hours ------Women: 7% of all work hours ------City of St. Louis Residents: 23% of all work hours

Details

3 Stories, 1 Story Below Grade, Renovation, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents