Similar Projects
Downtown Streetscapes - Phase I
Post-Bid
Clermont, FL

Cypress Creek, Parking Lot Project
Post-Bid
Lauderdale Lakes, FL

Concrete Driveway and Site Work for Lift Station #31 Project
Results
De Land, FL 32720

ADA Curb Ramp Improvements-Westside - Part 1-PQ Horizontal
Results
Less than $1,158,847 est. value
Jacksonville, FL 32099

Forest Edge Apartments - Parking Lot Improvements
Construction
Orlando, FL 32810

AutoNation Vehicle Storage Lot - Parking Area Upgrades
Construction
$750,000 est. value
Orlando, FL 32807

Knott Building Ada Improvements
Post-Bid
Tallahassee, FL

Pedestrian Walkway Coating Removal and Installation
Results
Tarpon Springs, FL 34688

ADA Ramp for AC Freeman House
Post-Bid
Punta Gorda, FL

Pensacola Beach Multi-Use Path Restoration - Phase 1
Results
Pensacola, FL

Building 845 Parking Lot Improvements
Post-Bid
FL

Pelican Marina - Boat Ramp Park Lot Renovations
Results
$1,809,161 est. value
Miami, FL

Parking Lot Paving and Sidewalk Installation at Mattie Williams Neighborhood Family Center
Post-Bid
Safety Harbor, FL 34695

Sidewalk Repairs-Hurricane IRMA
Results
$159,190 est. value
Miami, FL

Keystone Heights Elementary School Parking Lot
Post-Bid
Keystone Heights, FL

Last Updated 06/28/2019 03:26 PM
Project Title

Construction Manager at Risk Services for the Legacy Trail Extension Project

Physical Address View project details and contacts
City, State (County) FL   (Sarasota County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Legacy Trail Extension Project (“Project”) will include building (i) approximately 8 miles of paved, multi-use trail for non-motorized traffic, from the Hugh Culverhouse Nature Park and extending north to Fruitville Road in the City of Sarasota, (ii) approximately 4.5 miles of multi-use trail for the North Port Connector, (iii) at-grade crossings of intersecting public roads and bridges spanning two branches of Philippi Creek and the Deer Prairie Slough. Additional overpasses, bridges, boardwalks and other land or water crossings may be included depending on final route selection, public input and funding availability. There is a potential for existing railroad trestle bridges to be converted for trail use, where appropriate. This Project shall also include improvements to County-owned water, wastewater and communications utility infrastructure.
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents