Similar Projects
Waffle House
New Construction - 1,600 SF
Conception
$500,000 to $1,000,000 CJ est. value
Dayton, OH 45426

New Valley Street Restaurant
Renovation
Conception
Dayton, OH 45404

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

Blosser Street Reconstruction Phase 1
Infrastructure
Design
$614,965 CJ est. value
New Lebanon, OH 45345

Main Street Watermain Replacement
Infrastructure
Bidding
$354,425 CJ est. value
Brookville, OH 45309

Bayside and Barrett Water Main Replacement, Phase 2
Infrastructure
Bidding
$3,231,200 CJ est. value
Dayton, OH 45402

Rugby and Sunny view Plat Improvements
Infrastructure
Post-Bid
$265,355 est. value
OH

Homefull Campus
New Construction - 41,800 SF
Post-Bid
Dayton, OH 45417

Fourth Street Sycamore Creek Mitigation
Infrastructure
Results
$72,115 est. value
Miamisburg, OH 45342

Wesleyan Metropark Hodapp and Gilliland Site Clean-up
Infrastructure
Results
$108,094 est. value
Dayton, OH 45406

General Motors Engine Plant
New Construction - 251,000 SF
Construction
$175,000,000 est. value
Brookville, OH 45309

Culver's
New Construction
Construction
$1,200,000 to $1,500,000 est. value
Vandalia, OH

Trinity Community at Beavercreek - United Church Homes
Addition, Demolition, Infrastructure - 168,000 SF
Pending Verification
$8,000,000 CJ est. value
Beavercreek, OH 45440

The Foodbank Expansion
Addition, Demolition, Infrastructure - 6,000 SF
Pending Verification
$5,188,349 CJ est. value
Dayton, OH 45417

Xenia Avenue Mixed Use Development
Renovation
Conception
Dayton, OH 45410

Last Updated 10/31/2022 12:09 PM
Project Title

Warped Wing Brewery & Smokehouse

Physical Address View project details and contacts
City, State (County) Dayton, OH 45424   (Montgomery County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Food/Beverage Service, Manufacturing/Processing Plant, Site Development
Contracting Method To Subcontract, Bids by Invitation
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the conversion of a former truck pro building into a new craft brewery, smokehouse and beer garden. As of October 2022, this project is seeking development plan approval from the Huber Heights Planning Commission. The developer is expected to serve as the general contractor. No inquiries will be accepted. Construction is anticipated to start fall 2022 and be completed by spring 2023. A grand opening is expected to be held in summer 2023.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Laboratory Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents