Similar Projects
Netzsch Pump for Snapfnger Advanced Wastewater
Infrastructure
Bidding
GA

Remove Rebuild and Install Two Service Pumps at Hightower Pump Station
Infrastructure
Bidding
Conyers, GA 30013

Deep Well and Chemical Feed Building
Post-Bid
Less than $600,000 est. value
Pavo, GA 31778

Gill Street Well Improvements
Post-Bid
Ellaville, GA

Forrester Parkway, 1,000 GPM Deep Well
Results
Less than $725,000 est. value
Leesburg, GA 31763

Garnsey Range Potable Water Well
Term Contract
Results
Columbus, GA 31829

N041--509-20-4-5102-1054 Heating Water Pump in Room GG100
Post-Bid
Augusta, GA 31021

Hinesville Main Pumping Station Bar Screen Replacement
Results
Hinesville, GA 31310

N041--509-20-4-5102-1054 Heating Water Pump in Room GG100 (VA-20-00076166)
Post-Bid
Augusta, GA 30904

Building F and H Water Source Heat Pump Replacements
Results
Less than $610,652 est. value
Marietta, GA 30060

Replace Two Water Well Bladder Tanks
Post-Bid
Griffin, GA 30223

Existing Water Well Improvements
Results
Crawford, GA 30630

Pump Replacement at Library Well
Post-Bid
Waynesboro, GA 30830

Bentley Lake Road Well Installations
Results
Marietta, GA 30062

Warner Range Potable Water Well
Post-Bid
Columbus, GA 31901

Last Updated 11/04/2021 02:17 PM
Project Title

Pump 8 - 900 HP Raw Water Pump

Physical Address View project details and contacts
City, State (County) Cumming, GA 30041   (Forsyth County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project will involve furnishing all materials, labor, and equipment to install Owner provided equipment: 900 HP Vertical Turbine Pump, VFD, and Pump Control Valve, and piping and valves, electrical, SCADA equipment, associated services, and any appurtenances as necessary for completion of the work described within the plans and specifications.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents