Similar Projects
Maintain and Operate the West Regional WWTF Wetlands Systems
Term Contract
Bidding
Vero Beach, FL

Cody Sod Wetlands Restoration
Post-Bid
Okeechobee, FL 34972

Comprehensive Everglades Restoration Plan, Indian River Lagoon - South C-23/24 Stormwater Treatment Area
Post-Bid
$100,000,000 to $175,000,000 est. value
Port Saint Lucie, FL

F--Wetlands Restoration/Maintenance
Results
West Palm Beach, FL 33410

Mile Point Great Marsh Island Restoration
Results
Jacksonville, FL

Comprehensive Everglades Restoration Plan, Biscayne Bay Coastal Wetlands, L-31E Flow-Way, Contract 5B (A Phase I Project): Pump Station S-703 and Recreational Sites; Miami-Dade County, Florida
Post-Bid
$5,000,000 to $10,000,000 est. value
Miami, FL

Moorhen Marsh Low Energy Aquatic Plant System (LEAPS)
New Construction
Results
Less than $8,000,000 est. value
Vero Beach, FL 32967

Wakodahatchee Wetland Maintenance
Term Contract
Post-Bid
Boynton Beach, FL 33437

25.5 Acre Wetlands Remediation Project
Results
Sunrise, FL 33351

Environmental Remediation Services
Term Contract
Post-Bid
Jacksonville, FL

Emerging Environmental Requirements Acquisition (EERA)
Results
Less than $49,000,000 est. value

Environmental Habitat Protection - Pine Rockland
Results
Homestead, FL 33039

Brooker Creek Buffer Preserve Habitat Restoration
Results
Less than $640,750 est. value
Odessa, FL 33556

Annual Wetlands Maintenance Services
Term Contract
Results
Mulberry, FL

Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for Environmental Remediation Services in The Mobile District Area of Responsibility (Aor)
Results

Last Updated 11/19/2021 08:38 AM
Project Title

Sumter County Canal Cleaning Project

Physical Address View project details and contacts
City, State (County) FL   (Sumter County)
Category(s) Environmental
Sub-Category(s) Wetlands/Remediation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $68,582
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Canal Maintenance Location and Length: Contractor shall perform canal maintenance on a portion of canal "C," as shown in Attachment A. The total length of the portion of Canal "C" is estimated at 2,596 (+/-) linear feet (LF). Wetlands will not require Maintenance. However, No wetlands, as identified by the wetland inventory map from the Southwest Florida Water Management District (SWFWMD), exist within this portion of the project area. See attachment I for more information. No additional compensation will be made towards the lump sum quantity if the length is found to vary. The area of Maintenance starts at CR-721 and Ends at 2,596' North through Canal "C." (both banks of the canal and the bottom of the canal are considered in 1 linear foot of measurement). a. Approximate length of the portion of Canal C= 2,596 (+/-). 2. Canal Easement Data - Canal easement data metes and bounds and typical cross-sections are shown in the as-built attachments. The canal and easement typical cross-sections indicate an average bottom width between 4 and 20 feet. The as-builts also note a 55 LF maintenance easement section on both sides of the canal. This bottom width varies as the adjacent land elevation varies. Some clearing of the 55 LF easements may be necessary to traverse and provide access to the access the canal. Some areas of the canals are fenced off, and the 55-foot easements are on cleared portions of private property. If trees need to be removed for access along the 55 LF easement, then they shall be removed at the contractors' expense regardless of the tree diameter. Some canals are fenced both parallel to and across the canal at property lines. It is highly recommended that the Contractor follow the ditch lines whenever possible. The Contractor shall minimize entry and exit points along the canal, which in turn will reduce private property disturbance and fence replacement parallel to the ditch line.

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Water Remediation.
Division 32 - Exterior Improvements, Wetlands.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents