Similar Projects
Construction of Sidewalk, Planting and Irrigation
Post-Bid
Bastrop, TX

Parking Lot Improvement Project
Post-Bid
San Perlita, TX 78590

Concrete Walkway Project
Results
$25,000 to $100,000 est. value
Denton, TX 76209

ADA Compliant Sidewalk - Building 20709
Results
$25,000 to $100,000 est. value
El Paso, TX

Texas City Park & Ride - Administration Facility
New Construction - 13,100 SF
Construction
Texas City, TX 77591

HEB Austin 15 - Curbside #183
Addition - 1,925 SF
Construction
$250,000 est. value
Austin, TX 78753

Downtown Revitalization
Post-Bid
$300,000 est. value
Terrell, TX

New Front Easement Reconnections
Results
Less than $1,875,000 est. value
Houston, TX

Sidewalk Improvements - Phase II
Post-Bid
Channelview, TX

Safe Sidewalk Program
Results
$1,200,000 est. value
TX

Pfluger Hall Sidewalk & Drainage Improvements
Post-Bid
Pflugerville, TX 78660

Citywide Work Orders for CDSF Projects 2
Results
$3,250,000 est. value
TX

Wilson County Construction Services: Parking Lot B Improvements
Post-Bid
Floresville, TX 78114

Citywide Work Orders for CDSF Projects 3
Results
$4,250,000 est. value
TX

Sidewalk Repairs and Richmond Avenue Median Curb Improvements
Post-Bid
$500,000 to $1,000,000 est. value
Houston, TX 77000

Last Updated 08/14/2020 10:36 AM
Project Title

Montana RTS Pedestrian Enhancements

Physical Address View project details and contacts
City, State (County) El Paso, TX 79901   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 to $2,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Project involves the enhancements of ADA sidewalks, ADA ramps, and ADA driveways along Montana Avenue, beginning from Raynor Street and continuing up to Chelsea Street. The limits of construction are approximately 25’ west of Raynor Street along Montana Avenue and approximately 13’ east of Chelsea Street along Montana Avenue. The demolition of this project will consist of the removal of existing sidewalks, driveways, and other existing features. Safety lighting poles, fire hydrants, and streets signs will be relocated to provide a clear path along the sidewalk. 2. The Montana Rapid Transit System Pedestrian Enhancements Project consists of the construction of ADA compliant sidewalks, ramps, driveways, curb and gutter, and rolled curb and gutter, a new concrete flume and repair of approximately two feet of pavement adjacent to the curb and gutter. The roadway surface repair should match existing HMAC. 3. The sidewalk will be installed on the north and south side of Montana Avenue. Trees, and landscape ground cover, will be installed on bulbouts and other areas. An irrigation system will be installed to service the new landscape features. Various street signs, fire hydrants, and street lights will be relocated or replaced. 4. The Montana Rapid Transit System Pedestrian Enhancements Project consists of relocation and installation of signal poles and signal head upgrades and installation of Accessible Pedestrian Signals (APS) at the intersections of Montana Avenue and Raynor Street and Montana Avenue and Chelsea Street.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents