Similar Projects
Southeast Recreation Center Fitness Equipment
Alteration
Post-Bid
Aurora, CO

Electric Forklift
Alteration
Post-Bid
CO

Advance Metering Infrastructure (AMI) System
Results
Less than $3,500,000 est. value
Thornton, CO

Walk Thru Metal Detectors (WTMD)
Results

Hot Pressure Washer
Infrastructure
Post-Bid
Denver, CO

Equipment Rental
Term Contract
Results
Colorado Springs, CO

Buell Audio Equipment
Infrastructure
Post-Bid
Denver, CO

Police Emergency Equipment and Lighting
Alteration
Results
Loveland, CO

HVAC Filters and Belts
Alteration
Post-Bid
CO

Air Filters
Alteration
Results
Boulder, CO

Thornton Water Project - Pipe Purchase
Infrastructure
Post-Bid
Thornton, CO

South Boulder Road at-Grade Crossing Improvements Traffic Signal Poles and Mast Arms Materials and Freight
Infrastructure
Results
$67,600 est. value
Lafayette, CO 80026

Hydraulic Excavators
Alteration
Post-Bid
CO

Audio Visual Equipment and Installation Services
Alteration
Results
Denver, CO

4" Conduit
Alteration
Post-Bid
Fort Collins, CO

Last Updated 04/02/2023 07:31 AM
Project Title

Combi - Multi Cook Oven Replacement Timberline K-8 and Soaring Height PK-8

Physical Address View project details and contacts
City, State (County) Longmont, CO 80504   (Weld County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $117,339 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The St. Vrain Valley School District is requesting Bids from qualified vendors for the purchase, delivery, and installation of a combi - multi cook oven at Timberline K-8 and Soaring Heights PK-8 Schools. Reference Number: 0000312142 Question Acceptance Deadline: 03/09/2023 04:00 PM EST Questions are submitted online: Yes Contact Information: Shelly Henderson 303-702-8456 henderson_shelly@svvsd.org General Requirements - FOB Destination - FOB Pre-Paid - Insurance Required SVVSD is accepting bids for the purchase, delivery and installation of a combi oven and a multicook oven per the attached specification sheet at Timberline K-8 and Soaring Heights PK-8. Bidders may NOT contact any District officials or staff other than the Buyer listed herein prior to the bid opening. All questions must be received by 2:00 PM, Thursday, March 9, 2023. All questions MUST be submitted in writing through the Rocky Mountain EPurchasing website.

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents