Similar Projects
Olmsted Lock and Dam Final Site Restoration
Design
$1,000,000 to $5,000,000 est. value
Olmsted, IL 62970

Dike & Revetment - USACE St. Louis District
Design
$15,000,000 est. value
Cairo, IL

A/B and C/D Service Tunnel Rehabilitation - Phase III
New Construction
Bidding
$16,625,000 to $20,125,000 est. value
Chicago, IL

Upgrade Steam Tunnel Distribution System
New Construction
Bidding
$3,877,600 est. value
Oak Brook, IL

Olmsted Pole Barn 1 & 2 Construction
Post-Bid
$1,000,000 to $5,000,000 est. value
Olmsted, IL 62970

Mel Price Lift Gate Replacement
Post-Bid
Alton, IL

Lakeside Tunnel Isolation at Dallman Power Station
Renovation
Results
Springfield, IL 62701

Illinois River Basin Miter Gate Replacement
Results
$5,000,000 to $10,000,000 est. value
Joliet, Morris, IL

Chicago Harbor Lock Chamber Floor and Wall Repair
Renovation
Design
$25,000,000 to $100,000,000 est. value
Chicago, IL

Waukegan Harbor Breakwater Repairs, Waukegan, Lake County, Illinois
Post-Bid
$1,000,000 to $5,000,000 est. value
Waukegan, IL

Hammel Woods Dam Modification
Results
Shorewood, IL 60431

Chicago Harbor Lock Power Distribution Upgrades
Renovation
Design
$250,000 to $500,000 est. value
Chicago, IL 60604

Mel Price Main Lock Overlook Alterations
Renovation
Post-Bid
Alton, IL 62002

McKinley Woods Preserve Bridge Over the I and M Canal Improvements
Results
Less than $170,000 est. value
Channahon, IL 60410

Touhy Dam Removal
Post-Bid
Park Ridge, IL 60068

Last Updated 10/05/2021 03:16 PM
Project Title

Crab Orchard Dam Spillway Concrete Repairs

Physical Address View project details and contacts
City, State (County) IL   (Williamson County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This is a construction project consisting of all labor, materials, and equipment necessary for the repair of the concrete service spillway, outlet works structure, and downstream spillway training walls. It is anticipated that a temporary coffer dam will not be constructed by the contractor or necessary for completion of the concrete ogee service spillway repair.

Details

Dam/Tunnel, Build-Out.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents