Last Updated | 12/20/2022 03:06 PM |
Project Title | RFQ Construction Manager at Risk - Missouri Psychiatric Center - Infrastructure and ED Observation Renovation |
Physical Address | View project details and contacts |
City, State (County) | Columbia, MO 65201 (Boone County) |
Category(s) | Heavy and Highway, Medical |
Sub-Category(s) | Hospital, Site Development |
Contracting Method | Construction Management - CM at Risk, Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected April 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $6,079,260 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The University of Missouri-Columbia is requesting qualifications from firms to provide Construction Manager at Risk (CMR) with guaranteed maximum price services for a Missouri Psychiatric Center Infrastructure and ED Observation Renovation. This project shall have a Supplier Diversity participation goal of 10% MBE and 3% WBE/Veteran/ServiceDisabled Veteran/DBE of the GMP. The Construction Manager at Risk is strongly encouraged to include minority and women owned firms. CMRs are also strongly encouraged to include Missouri-based firms on the team. The project generally consists of the demolition and remodel of approximately 5,800 SF of the 1st floor of Missouri Psychiatric Center, along with providing and installing new infrastructure equipment which will serve the remodeled area. (Note: The emergency power infrastructure work is sized to support the entire MPC building in the future.) The remodeled area will become a 16-bed ED/Obs unit consisting of 23-hour patient rooms, caregiver stations, and other support spaces, i.e., clean room, soil room, etc. The infrastructure equipment includes a new roof top unit, exterior ductwork from the roof to the first floor, new ground mounted emergency generator and fuel tank, and new transfer switches and main distribution gear located in the basement. Additionally, chilled water pumps are being replaced in the basement as well. The work will be done in an occupied psychiatric facility and necessitate increased security and safety protocols for all working on the project. The project will be dividing into several phases on the first floor to accommodate shifting occupancies and allow continuous operation of the facility during construction. The project budget is $6,079,260. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | 5,800 SF.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |