Similar Projects
Oasis Road Solar Garden
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Sunrise Township, MN 55056

Katie's Glen
New Construction, Infrastructure
Design
$21,500,000 CJ est. value
Wyoming, MN 55092

Katie's Glen
New Construction, Infrastructure
Design
$21,500,000 CJ est. value
Wyoming, MN 55092

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Road Right-of-Way Maintenance Equipment
Infrastructure
Post-Bid

2021 Street Overlay
Infrastructure
Results
North Branch, MN

2021 Street Improvement Project
Infrastructure
Results
Wyoming, MN

Coral Bells Solar
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
North Branch, MN 55056

Teal Avenue Solar Garden
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Shafer, MN 55074

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Frandsen Avenue Improvements
Infrastructure
Results
Rush City, MN

Rental Equipment: Road Construction and Maintenance
Term Contract
Post-Bid
$1,500,000 to $2,000,000 est. value

CSAH 11 Microsurfacing
Infrastructure
Results
MN

Janet Johnson Memorial WMA Gravel and Grade
Infrastructure
Post-Bid
North Branch, MN 55056

CSAH 26 Reconstruction
Infrastructure
Results
Center City, MN

Last Updated 11/01/2022 09:24 AM
Project Title

2022 Local Street Overlay

Physical Address View project details and contacts
City, State (County) North Branch, MN 55056   (Chisago County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $912,534 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 18, 2022, project was awarded, start date is August 2, 2022 and will be completed by September of this year** The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: 1,600 S Y Remove and Replace Bituminous Pavement 1,000 L F Remove and Replace Concrete Curb and Gutter 13,340 S Y Mill Bituminous Pavement (Special) 6,900 TON Type SP 9.5 Wearing Course Mix (2,C) 3,000 S Y Site Restoration The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this contract. All bidders and persons or companies providing a response/submission to the Advertisement for Bids of the City of North Branch shall comply with the provisions of the statute. The City Council reserves the right to reject any and all Bids and to waive any Bids received without explanation. No Bid may be withdrawn for a period of 60 days. For all further requirements regarding Bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents