Similar Projects
Overbrook Pump Station Improvements Project
New Construction
Bidding
Shillington, PA

Scott Road Pump Station and Forcemain Upgrade - General Construction
Infrastructure
Bidding
$25,000 est. value
State College, PA 16801

Bunker Hill Water Pump Station
Post-Bid
Central City, PA 15926

Clubhouse Outdoor Pool - Filter Room Mechanicals
Post-Bid
Blooming Grove, PA 18428

Long Term Control Plan Project 2018 Lift Station Improvements - General Construction
Results
Rochester, PA 15074

Knox Avenue Pumping Station Upgrades
Results
$650,000 est. value
Easton, PA 18043

Municipal Drive Pump Station And Force Main, General/Mechanical
Construction
$1,200,000 est. value
Downingtown, PA 19372

Kohler Tract Pumping Station - General Construction
Construction
$1,300,000 est. value
Emmaus, PA 18049

Scott Road Pump Station and Forcemain Upgrade Engineer's - Electrical Construction
Infrastructure, Alteration
Bidding
$25,000 est. value
State College, PA 16801

Eastwood Pump Station Elimination Project
Post-Bid
North East, PA 16428

Montgomery Pump Station Improvements
Results
Folcroft, PA 19032

Flow Diversion - Pump Stations & Force Main Combined
Construction
North Wales, PA 19436

Beeson Avenue Pump Station
Post-Bid
Marianna, PA 15345

Commercial Iron Shop and In-Field Services at Transfer Stations 1 & 3
Renovation
Results
Chester, PA

Installation of New Direct In-Line Pumps at the Scott Township Sewer and Water Authority (STSWA) Pump Stations No 5 and No 8
Construction
Jermyn, PA 18433

Last Updated 07/15/2021 08:22 AM
Project Title

Bortondale Pump Station Improvement Project - General Construction

Physical Address View project details and contacts
City, State (County) Media, PA   (Delaware County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. Work of the Project includes but is not limited to, Furnishing and Installing: 1. A Factory Built Duplex Pump Station; 2. New Concrete Wet Well; 3. Convert existing wet well to a junction manhole; 4. Comminutor B. Any required by-pass pumping shall be the responsibility of the contractor while coordinating with the sewer authority and while using the by-pass pumps on site. C. The work also includes demolition of certain portions of the Pump Station.

Details

Lift and Pump Stations, Addition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents