Similar Projects
Karst Farm Trail
Bidding
Bloomington, IN

Studebaker Park Asphalt Path
Bidding
Elkhart, IN 46516

Engineering Services for 2021 Site Improvements @ Haley Elementary School
Post-Bid
Fort Wayne, IN 46802

Joint Sealing System
Post-Bid
Indianapolis, IN 46077

Community Crossing Street Resurface Program
Results
Lake Station, IN 46405

IDIQ, Patch and Rehab Pavement
Results

Hardscape Improvements
Bidding
Lebanon, IN 46052

Tincher Road Resurfacing
Post-Bid
Mooresville, IN 46158

Deep River Rock Riffle Improvements
Renovation
Results
Lake Station, IN 46405

Asphalt Resurface
Bidding
IN

Smokey Row Road HMA Surface with Full Depth Patching
Post-Bid
IN

Olio Road & 146th Street Improvements
Results
$6,082,738 est. value
Noblesville, IN 46060

Institution and Park Road Maintenance
Bidding
IN

Ready Mix
Post-Bid
Indianapolis, IN 46204

New Entrance Roundabout
Results
Terre Haute, IN 47802

Reported 02/12/2021 12:00 AM
Project Title

Community Crossings Paving

Physical Address View project details and contacts
City, State (County) Corydon, IN 47112   (Harrison County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Farquar Avenue from High Street to Elliot Avenue - Mo-bilization, Remove Curb, Remove Drive/Step Approach, Header Curb, Wedge Asphalt for Curb, #53 Stone under Curb, Concrete Drive/Step Approach, Driveways and Steps to Meet New Asphalt, 3 Steps and 5 Driveways (10’ x 10’ x 6” Driveways), Concrete, Handicap Ramp, Topsoil/Seed Behind Curb, Asphalt Milling 1.5”, HMA Surface Type B 9.5MM; Poplar Street from S. Capitol Avenue to Water Street - Mobilization, Asphalt Milling 1.5”, HMA Surface Type B 9.5MM; South Hill Street from Chestnut Street to .06 Miles South of Chestnut Street - Mobilization, Asphalt Milling 1.5”, HMA Surface, Type B, 9.5MM 1.5”; Beech Street from 0.027 miles East of S Lemmon Street to Mulberry Street - Mobilization, Clean, Mill Tie Ins, Asphalt Milling 1.5” (Mill Full Width), HMA Surface Type B 9.5 MM 1.5”; Ridgemont Drive from O’Bannon Avenue to 0.074 Miles South of Ridgeview Drive - Mobilization, Clean, Mill Tie Ins, HMA Surface Type B 9.5MM; Ridgeview Drive from Ridgemont Drive to 0.042 miles East of Ridgemont Drive - Mobilization, Clean, Mill Tie Ins, HMA Surface Type B 9.5MM 1.5”; High School Road from Country Club Road to Ashton Drive - Mobilization, Asphalt Milling 1.5”, HMA Surface Type B 9.5 MM 1.5”; Ashton Drive from SR 337 to High School Road - Mobilization, Clean, Mill Tie ins, HMA Sur-face Type B 9.5MM 1.5”; High Street from N. Capitol Av-enue to Water Street - Mobilization, Asphalt Milling 1.5”, HMA Surface Type B, 9.5MM 1.5”; Dale Avenue from SR 62 to Church Street - Mobilization, Asphalt Milling 1.5”, HMA Surface Type B 9.5 MM 1.5”; Franklin Street from Maple Street to Finn Street - Mobilization, Clean, Mill Tie Ins, HMA Surface Type B 9.5MM 1.5”

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents