Reported | 02/12/2021 12:00 AM |
Project Title | Community Crossings Paving |
Physical Address | View project details and contacts |
City, State (County) | Corydon, IN 47112 (Harrison County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Farquar Avenue from High Street to Elliot Avenue - Mo-bilization, Remove Curb, Remove Drive/Step Approach, Header Curb, Wedge Asphalt for Curb, #53 Stone under Curb, Concrete Drive/Step Approach, Driveways and Steps to Meet New Asphalt, 3 Steps and 5 Driveways (10’ x 10’ x 6” Driveways), Concrete, Handicap Ramp, Topsoil/Seed Behind Curb, Asphalt Milling 1.5”, HMA Surface Type B 9.5MM; Poplar Street from S. Capitol Avenue to Water Street - Mobilization, Asphalt Milling 1.5”, HMA Surface Type B 9.5MM; South Hill Street from Chestnut Street to .06 Miles South of Chestnut Street - Mobilization, Asphalt Milling 1.5”, HMA Surface, Type B, 9.5MM 1.5”; Beech Street from 0.027 miles East of S Lemmon Street to Mulberry Street - Mobilization, Clean, Mill Tie Ins, Asphalt Milling 1.5” (Mill Full Width), HMA Surface Type B 9.5 MM 1.5”; Ridgemont Drive from O’Bannon Avenue to 0.074 Miles South of Ridgeview Drive - Mobilization, Clean, Mill Tie Ins, HMA Surface Type B 9.5MM; Ridgeview Drive from Ridgemont Drive to 0.042 miles East of Ridgemont Drive - Mobilization, Clean, Mill Tie Ins, HMA Surface Type B 9.5MM 1.5”; High School Road from Country Club Road to Ashton Drive - Mobilization, Asphalt Milling 1.5”, HMA Surface Type B 9.5 MM 1.5”; Ashton Drive from SR 337 to High School Road - Mobilization, Clean, Mill Tie ins, HMA Sur-face Type B 9.5MM 1.5”; High Street from N. Capitol Av-enue to Water Street - Mobilization, Asphalt Milling 1.5”, HMA Surface Type B, 9.5MM 1.5”; Dale Avenue from SR 62 to Church Street - Mobilization, Asphalt Milling 1.5”, HMA Surface Type B 9.5 MM 1.5”; Franklin Street from Maple Street to Finn Street - Mobilization, Clean, Mill Tie Ins, HMA Surface Type B 9.5MM 1.5” |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |