Similar Projects
Museum of History and Industry Renovation
Renovation
Conception
$10,000,000 CJ est. value
Seattle, WA 98109

ASUW Shell House - University of Washington
Renovation - 10,000 SF
Conception
$18,500,000 CJ est. value
Seattle, WA 98195

Asia Pacific Cultural Center Expansion
Addition, Infrastructure - 10,100 SF
Design
$10,000,000 est. value
Tacoma, WA 98409

University of Washington Basketball Training & Operations Facility
New Construction
Design
$53,000,000 est. value
Seattle, WA 98195

SCC - Campus Security Upgrades
Renovation
Bidding
$1,200,000 CJ est. value
Anderson Island, WA 98303

Rocky Reach Hillside Repair
Infrastructure
Bidding
$320,000 CJ est. value
Wenatchee, WA 98801

RFQ D/B - Construction of ARS/WSU Plant Bioscience Research Building
New Construction, Infrastructure - 113,703 SF
Post-Bid
$89,000,000 CJ est. value
Pullman, WA 99163

Spokane Community College Building 8 Remodel
Renovation - 16,000 SF
Post-Bid
$3,500,000 to $4,000,000 est. value
Spokane, WA 99207

Architectural Services for North Academic Complex CWU
New Construction
Results
Ellensburg, WA

Lacey Museum and Cultural Center
New Construction
Results
$350,000 to $500,000 est. value
Lacey, WA 98503

Heritage University Early Learning Center / Toppenish
New Construction, Infrastructure
Construction
$4,100,000 CJ est. value
Toppenish, WA 98948

Student Services and Instructions Building
New Construction - 69,965 SF
Construction
$38,500,000 to $43,000,000 est. value
Aberdeen, WA 98520

RFP - Restoration of the Railroad Track
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Chehalis, WA 98532

Advanced Manufacturing Center
New Construction, Infrastructure
Pending Verification
$51,500,000 CJ est. value
Vancouver, WA 98660

Rock Island Silicon Plant Redevelopment
Demolition, New Construction, Infrastructure, Build-out
Conception
$20,000,000 CJ est. value
Rock Island, WA 98850

Last Updated 06/05/2023 11:35 AM
Project Title

Eastlick-Abelson-Bustad Renovations

Physical Address View project details and contacts
City, State (County) Pullman, WA 99163   (Whitman County)
Category(s) Education, Entertainment/Recreation
Sub-Category(s) College/University, Museum
Contracting Method Competitive Bids
Project Status Accepting Qualifications, Request for Qualifications, Construction start expected June 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $21,862,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Washington State University Request for Qualifications For Design Build Services Eastlick-Abelson-Bustad Renovations Pullman, WA. Statements of Qualifications Submittals will be received by Washington State University, Facilities Services, from firms interested in providing Progressive Design-Build services for renovating 41,500 square feet of space to Bustad, Eastlick and Abelson halls on the Pullman campus of Washington State University. Washington State University is seeking a design-build partner who is committed to collaboratively developing a unique and tailored solution with the University stakeholders. The University is seeking a team which can develop a thoughtful, meaningful, functional, solution which serves all the program needs and strengthens the campus. The goal of the WSU progressive design-build process is to work with a committed team of skilled designers and builders to develop this project. The design-build team must be sufficiently familiar with the project parameters such that they are able to commit to achieving the programmatic goals working with the University team. WSU is not seeking a developed solution through the RFQ and RFP process, but rather is seeking a team with whom we can collaborate and develop the most successful building solution that meets the needs of the program. WSU is seeking teams who demonstrate a very clear understanding of the distinction between an immediate DesignBuild solution versus a commitment to a process of exploration. The project is located within three buildings Eastlick Hall - 300 NE Veterans Mall, Pullman WA 99164 Abelson Hall - 205 NE Library Mall, Pullman WA 99164 Bustad Hall - 1845 E Grimes Way, Pullman WA 99164 The interior renovation in Eastlick Hall will primarily be teaching labs for the School of Biological Sciences. Abelson Hall will include interior renovation for Research Labs. Renovation for the College of Veterinary Medicine will occur in Bustad Hall, for both Teaching labs and Simulation Laboratory with support spaces. The DB team will assist WSU in determining the infrastructure updates in each building to support the research space renovations. The Eastlick and Abelson Halls project includes a small renovation in Bustad Hall, and is approximately 33,040 sf. The Bustad Hall Simulation Lab project is approximately 8,432 sf. The Guaranteed Maximum Price (GMP) Design-Build budget for this Project will be $21,862,000 ($16,468,000 for the Eastlick-Abelson-Bustad portion of the Project and $5,394,000 for the Bustad Simulation Laboratory portion of the Project). The GMP shall include all design and construction costs, contingencies, indirect and reimbursable expenses, and fees to complete the Project. The GMP does not include Washington state sales tax, see Section 00 50 00 - Agreement between Owner and Design-Builder. All questions regarding this Design-Build Procurement shall be addressed to Joanie Thomas, Project Manager, thomasjl@wsu.edu. As of May 25, 2023, the due date and time for qualifications has been confirmed with the owner.

Details

41,500 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Loading Dock Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Site Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents