Similar Projects
Utilities - US 60
Infrastructure
Design
$500,000 CJ est. value
Enid, OK 73701

Resurface - US 64
Infrastructure
Design
$7,000,000 CJ est. value
Garber, OK 73738

Grade, Drain, and Surface - SH-15
Infrastructure
Bidding
$1,000,000 CJ est. value
Garber, OK 73738

Bridge and Approaches - NS-295
Infrastructure
Bidding
$2,000,000 CJ est. value
Enid, OK 73701

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

Pacer Softball Fieldhouse
Demolition, New Construction, Infrastructure
Post-Bid
$600,000 CJ est. value
Enid, OK 73703

Resurface (Asphalt) - US-64/US-412
Infrastructure
Results
$10,846,079 CJ est. value
Enid, OK 73701

Pavement Rehabilitation (Asphalt) - SH-74
Infrastructure
Results
$1,343,870 CJ est. value
Garber, OK 73738

100-700 N Blocks 10th St Waterline Relocation
Infrastructure
Bidding
$500,000 CJ est. value
Enid, OK 73701

Flooring and Paint F690
Term Contract, Renovation, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Enid, OK 73703

Pavement Rehabilitation (Asphalt) - SH-15/SH-74
Infrastructure
Results
$781,670 CJ est. value
Garber, OK 73738

54th St Lift Station Capacity Improvements Phase II
Infrastructure
Bidding
$300,000 CJ est. value
Enid, OK 73701

Reprogram Active Vehicle Barriers
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Enid, OK 73703

700-1600 Blocks East Oklahoma Avenue Waterline Relocation
Infrastructure
Results
$822,515 CJ est. value
Enid, OK 73701

500 S to 700 N Block 10th St Reconstruction
Infrastructure
Bidding
$500,000 CJ est. value
Enid, OK 73701

Last Updated 04/17/2023 05:35 PM
Project Title

Garber Schools - New Field House & Cafeteria Improvements

Physical Address View project details and contacts
City, State (County) Garber, OK 73738   (Garfield County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Food/Beverage Service, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

GENERAL 1. Scope: Furnish and install 60 mil single-ply membrane roofing system that is fabricated of a weft inserted low-shrink, anti-wicking polyester fabric and has a thermoplastic coating of co-polymer alloy (CPA) material laminated to both sides, as manufactured by Duro-Last Roofing, Inc. or approved equal. 2. Application: Thermoplastic coated membrane (CPA) consists of a weft inserted polyester scrim (18x14, 100 denier), laminated on both sides with a plasticized blend of vinyl and acrylic polymers allowing installation through the use of continuous 3-1/4 inch securing tabs, factory dielectrically welded every 57 inches on center (prefabricated). Mechanical fasteners and distribution plates are used through the 3-1/4 inch tab. 3. Physical Properties: The single ply membrane must be capable of being installed at any time of the year, and shall provide resistance to ultra-violet rays, tear and puncture strength, and shall be impervious to caustic chemicals and acids, and show no ill effects to heat or cold. 4. Regulatory Agencies: Membrane and related items shall be classified by Underwriters Laboratories, Inc. as a Class A Sheathing Material for use in construction of Class A coverings and amendments. (Membrane and related items shall be Factory Mutual Research approved as an FM I-90 assembly and installation.) 5. Roofing Contractor's Qualifications: A. Contractor shall submit work history data showing successful warranted installation experience of the system specified. Contractor shall be certified and authorized by the roofing system manufacturer to install the specified manufacturer's materials. Contractor must have been certified by manufacturer for the past 5 years, and shall have 5 years minimum experience installing the system specified, and have installed a minimum of 2 million square feet of the manufacturer's system. B. The contractor shall use qualified workmen who are thoroughly trained in the crafts and techniques required to properly install the type of roofing system and related work specified, and to complete the work within the required time. C. The contractor shall have an experienced, pre-qualified, thoroughly trained superintendent having experience installing the roof system specified, who is familiar with the requirements of this project, on the job at all times when roofing system work is in progress. Training for superintendent shall include certification of completion of manufacturer's in-house training course and on-site training. D. Contractor must be located within 200 miles of the project, and must be capable of responding to leak calls within 3 hoursr

Details

1 Story Above Grade, 6,200 SF.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents